Improvement of existing road to 2 laning with Hard Shoulders of Maram -Peren section Package-1A, length- 22.340Km from Design Chainage 0.000 km to 22.340 km on NH-129A in the State of Manipur on EPC mode
Original Cost
₹226 Cr
Baseline estimate
Revised Cost
₹226 Cr
Latest approved cost
Expenditure
₹190 Cr
Spent to date
Utilization
84.2%
Of revised budget
Cost Status
On Budget
No escalation
Remaining
₹36 Cr
Budget left
Budget Utilization
84.2%Spent
₹190 Cr
Remaining
₹36 Cr
Total
₹226 Cr
Budget Split
Project Timeline
Project Approved
Construction / Implementation
Original End Date
22/12/2022
Revised Completion
31/03/2027
Completed
Project Details
Financial Summary
Project Intelligence
Project is within original budget of ₹226 Cr — no cost escalation recorded.
Expenditure stands at ₹190 Cr, which is 84.2% of the revised project cost.
Remaining budget: ₹36 Cr. Tracked under the DPIIT Investment Project Monitoring system.
Sector: Roads & Highways. Ministry: Ministry of Road Transport & Highways.
Improvement of existing road to 2 laning with Hard Shoulders of Maram -Peren section Package-1A, length- 22.340Km from Design Chainage 0.000 km to 22.340 km on NH-129A in the State of Manipur on EPC mode is a centrally-funded infrastructure project under Ministry of Road Transport & Highways, in the Roads & Highways sector. The original approved cost is ₹226.00 Cr.
This project is tracked under the Investment Project Monitoring (IPM) system maintained by DPIIT. Other central projects in the same sector are listed below.
Frequently Asked Questions
- QWhat is IPM project "Improvement of existing road to 2 laning with Hard Shoulders of Maram -Peren sec"?
- Improvement of existing road to 2 laning with Hard Shoulders of Maram -Peren section Package-1A, length- 22.340Km from Design Chainage 0.000 km to 22.340 km on NH-129A in the State of Manipur on EPC mode is a centrally-funded infrastructure project under the Ministry of Road Transport & Highways, tracked through the Investment Project Monitoring (IPM) system. Sector: Roads & Highways. State: Manipur. Original cost: ₹226 Cr.
- QWhat is the cost overrun for this Bihar IPM project?
- The original cost of ₹226 Cr has not been significantly revised. Expenditure: ₹190 Cr (84.2% of cost). Data as of 2026-08.
- QWhich ministry is responsible for this project?
- Improvement of existing road to 2 laning with Hard Shoulders is under the Ministry of Road Transport & Highways in the Roads & Highways sector. Project code: 618416. Bihar is one of the states tracked under the central IPM dashboard for this project.
- QWhat is the IPM dashboard and what does it track?
- The Investment Project Monitoring (IPM) dashboard, maintained by DPIIT (Department for Promotion of Industry and Internal Trade), tracks centrally-funded infrastructure projects worth ₹150 Crore and above. Improvement of existing road to 2 laning with Hard Shoulders is one of several Bihar projects tracked under the Roads & Highways sector on the IPM system.