Roads & HighwaysIPM · Central Project#618416

Improvement of existing road to 2 laning with Hard Shoulders of Maram -Peren section Package-1A, length- 22.340Km from Design Chainage 0.000 km to 22.340 km on NH-129A in the State of Manipur on EPC mode

Ministry of Road Transport & HighwaysManipur
Revised Cost: ₹226 CrUtilization: 84.2%

Original Cost

₹226 Cr

Baseline estimate

On budget

Revised Cost

₹226 Cr

Latest approved cost

Expenditure

₹190 Cr

Spent to date

Utilization

84.2%

Of revised budget

Stable

Cost Status

On Budget

No escalation

Remaining

₹36 Cr

Budget left

Budget Utilization

84.2%
0%25%50%75%100%

Spent

₹190 Cr

Remaining

₹36 Cr

Total

₹226 Cr

Budget Split

SpentRemaining

Project Timeline

Project Approved

Construction / Implementation

Original End Date

22/12/2022

Revised Completion

31/03/2027

Completed

Project Details

Project Code618416
SectorRoads & Highways
MinistryMinistry of Road Transport & Highways
StateManipur
Data Month2026-08

Financial Summary

Original Cost₹226 Cr
Revised Cost₹226 Cr
Expenditure₹190 Cr
Original End Date22/12/2022
Revised Date31/03/2027

Project Intelligence

Project is within original budget of ₹226 Cr — no cost escalation recorded.

Expenditure stands at ₹190 Cr, which is 84.2% of the revised project cost.

Remaining budget: ₹36 Cr. Tracked under the DPIIT Investment Project Monitoring system.

Sector: Roads & Highways. Ministry: Ministry of Road Transport & Highways.

Improvement of existing road to 2 laning with Hard Shoulders of Maram -Peren section Package-1A, length- 22.340Km from Design Chainage 0.000 km to 22.340 km on NH-129A in the State of Manipur on EPC mode is a centrally-funded infrastructure project under Ministry of Road Transport & Highways, in the Roads & Highways sector. The original approved cost is ₹226.00 Cr.

This project is tracked under the Investment Project Monitoring (IPM) system maintained by DPIIT. Other central projects in the same sector are listed below.

?

Frequently Asked Questions

QWhat is IPM project "Improvement of existing road to 2 laning with Hard Shoulders of Maram -Peren sec"?
Improvement of existing road to 2 laning with Hard Shoulders of Maram -Peren section Package-1A, length- 22.340Km from Design Chainage 0.000 km to 22.340 km on NH-129A in the State of Manipur on EPC mode is a centrally-funded infrastructure project under the Ministry of Road Transport & Highways, tracked through the Investment Project Monitoring (IPM) system. Sector: Roads & Highways. State: Manipur. Original cost: ₹226 Cr.
QWhat is the cost overrun for this Bihar IPM project?
The original cost of ₹226 Cr has not been significantly revised. Expenditure: ₹190 Cr (84.2% of cost). Data as of 2026-08.
QWhich ministry is responsible for this project?
Improvement of existing road to 2 laning with Hard Shoulders is under the Ministry of Road Transport & Highways in the Roads & Highways sector. Project code: 618416. Bihar is one of the states tracked under the central IPM dashboard for this project.
QWhat is the IPM dashboard and what does it track?
The Investment Project Monitoring (IPM) dashboard, maintained by DPIIT (Department for Promotion of Industry and Internal Trade), tracks centrally-funded infrastructure projects worth ₹150 Crore and above. Improvement of existing road to 2 laning with Hard Shoulders is one of several Bihar projects tracked under the Roads & Highways sector on the IPM system.