Improvement and Widening two lannig with paved Shoulder of NH 127B from km 31.500 Goeragre to km 63.224 Package-II in state of Meghalaya
Original Cost
₹504 Cr
Baseline estimate
Revised Cost
₹351 Cr
Latest approved cost
Expenditure
₹76 Cr
Spent to date
Utilization
21.6%
Of revised budget
Cost Status
On Budget
No escalation
Remaining
₹275 Cr
Budget left
Budget Utilization
21.6%Spent
₹76 Cr
Remaining
₹275 Cr
Total
₹351 Cr
Budget Split
Project Timeline
Project Approved
Construction / Implementation
Original End Date
15/05/2027
Revised Completion
Completed
Project Details
Financial Summary
Project Intelligence
Project is within original budget of ₹504 Cr — no cost escalation recorded.
Expenditure stands at ₹76 Cr, which is 21.6% of the revised project cost.
Remaining budget: ₹275 Cr. Tracked under the DPIIT Investment Project Monitoring system.
Sector: Roads & Highways. Ministry: Ministry of Road Transport & Highways.
Improvement and Widening two lannig with paved Shoulder of NH 127B from km 31.500 Goeragre to km 63.224 Package-II in state of Meghalaya is a centrally-funded infrastructure project under Ministry of Road Transport & Highways, in the Roads & Highways sector. The original approved cost is ₹504.00 Cr.
This project is tracked under the Investment Project Monitoring (IPM) system maintained by DPIIT. Other central projects in the same sector are listed below.
Frequently Asked Questions
- QWhat is IPM project "Improvement and Widening two lannig with paved Shoulder of NH 127B from km 31.50"?
- Improvement and Widening two lannig with paved Shoulder of NH 127B from km 31.500 Goeragre to km 63.224 Package-II in state of Meghalaya is a centrally-funded infrastructure project under the Ministry of Road Transport & Highways, tracked through the Investment Project Monitoring (IPM) system. Sector: Roads & Highways. State: Meghalaya. Original cost: ₹504 Cr.
- QWhat is the cost overrun for this Bihar IPM project?
- The original cost was ₹504 Cr and has been revised to ₹351 Cr — a cost overrun of -30.4%. Expenditure to date: ₹76 Cr (21.6% of revised cost). Data as of 2026-08.
- QWhich ministry is responsible for this project?
- Improvement and Widening two lannig with paved Shoulder of N is under the Ministry of Road Transport & Highways in the Roads & Highways sector. Project code: 618076. Bihar is one of the states tracked under the central IPM dashboard for this project.
- QWhat is the IPM dashboard and what does it track?
- The Investment Project Monitoring (IPM) dashboard, maintained by DPIIT (Department for Promotion of Industry and Internal Trade), tracks centrally-funded infrastructure projects worth ₹150 Crore and above. Improvement and Widening two lannig with paved Shoulder of N is one of several Bihar projects tracked under the Roads & Highways sector on the IPM system.