Roads & HighwaysIPM · Central Project#618370

Improvement and Widening to 2-lane with paved shoulder of road from Km 101.300 to km 127.319 Total Length 26.019 Km i.e. the Khowai Teliamura-Amarpur-Harina-Sabroom section of NH 208 in the state of Tripura on EPC under JICA ODA Loan Phase VI Package-1

Ministry of Road Transport & HighwaysTripura
Revised Cost: ₹432 CrUtilization: 61.4%

Original Cost

₹432 Cr

Baseline estimate

On budget

Revised Cost

₹432 Cr

Latest approved cost

Expenditure

₹265 Cr

Spent to date

Utilization

61.4%

Of revised budget

Stable

Cost Status

On Budget

No escalation

Remaining

₹167 Cr

Budget left

Budget Utilization

61.4%
0%25%50%75%100%

Spent

₹265 Cr

Remaining

₹167 Cr

Total

₹432 Cr

Budget Split

SpentRemaining

Project Timeline

Project Approved

Construction / Implementation

Original End Date

17/07/2026

Revised Completion

17/04/2027

Completed

Project Details

Project Code618370
SectorRoads & Highways
MinistryMinistry of Road Transport & Highways
StateTripura
Data Month2026-08

Financial Summary

Original Cost₹432 Cr
Revised Cost₹432 Cr
Expenditure₹265 Cr
Original End Date17/07/2026
Revised Date17/04/2027

Project Intelligence

Project is within original budget of ₹432 Cr — no cost escalation recorded.

Expenditure stands at ₹265 Cr, which is 61.4% of the revised project cost.

Remaining budget: ₹167 Cr. Tracked under the DPIIT Investment Project Monitoring system.

Sector: Roads & Highways. Ministry: Ministry of Road Transport & Highways.

Improvement and Widening to 2-lane with paved shoulder of road from Km 101.300 to km 127.319 Total Length 26.019 Km i.e. the Khowai Teliamura-Amarpur-Harina-Sabroom section of NH 208 in the state of Tripura on EPC under JICA ODA Loan Phase VI Package-1 is a centrally-funded infrastructure project under Ministry of Road Transport & Highways, in the Roads & Highways sector. The original approved cost is ₹432.00 Cr.

This project is tracked under the Investment Project Monitoring (IPM) system maintained by DPIIT. Other central projects in the same sector are listed below.

?

Frequently Asked Questions

QWhat is IPM project "Improvement and Widening to 2-lane with paved shoulder of road from Km 101.300 t"?
Improvement and Widening to 2-lane with paved shoulder of road from Km 101.300 to km 127.319 Total Length 26.019 Km i.e. the Khowai Teliamura-Amarpur-Harina-Sabroom section of NH 208 in the state of Tripura on EPC under JICA ODA Loan Phase VI Package-1 is a centrally-funded infrastructure project under the Ministry of Road Transport & Highways, tracked through the Investment Project Monitoring (IPM) system. Sector: Roads & Highways. State: Tripura. Original cost: ₹432 Cr.
QWhat is the cost overrun for this Bihar IPM project?
The original cost of ₹432 Cr has not been significantly revised. Expenditure: ₹265 Cr (61.4% of cost). Data as of 2026-08.
QWhich ministry is responsible for this project?
Improvement and Widening to 2-lane with paved shoulder of ro is under the Ministry of Road Transport & Highways in the Roads & Highways sector. Project code: 618370. Bihar is one of the states tracked under the central IPM dashboard for this project.
QWhat is the IPM dashboard and what does it track?
The Investment Project Monitoring (IPM) dashboard, maintained by DPIIT (Department for Promotion of Industry and Internal Trade), tracks centrally-funded infrastructure projects worth ₹150 Crore and above. Improvement and Widening to 2-lane with paved shoulder of ro is one of several Bihar projects tracked under the Roads & Highways sector on the IPM system.