Industrial Units384+ Approved|
Awarded Value₹24,500+ Cr|
MP Fund Utilization78% Average|
Highway Network1,200 km+|
Energy Stability23.5 Hrs/Day|
Active Projects842 Tracked|
Education Index+15.3% Trend|
Cabinet decisionsActive Tracking|
Airport movements3.2M+ Annual|
EC MonitoringLive Updates|
Litigation tracker480+ Cases|
Industrial Units384+ Approved|
Awarded Value₹24,500+ Cr|
MP Fund Utilization78% Average|
Highway Network1,200 km+|
Energy Stability23.5 Hrs/Day|
Active Projects842 Tracked|
Education Index+15.3% Trend|
Cabinet decisionsActive Tracking|
Airport movements3.2M+ Annual|
EC MonitoringLive Updates|
Litigation tracker480+ Cases|
BiharInfraTalesBIHARINFRATALES
DashboardTenderCensusMP FundCabinetEC MonitoringAirportsTownshipsLitigation
  1. BiharInfraTales
  2. /IPM Dashboard
  3. /Improvement and Up gradation to four lane with Pav
IPM Dashboard
Roads & HighwaysIPM · Central Project
#618251

Improvement and Up gradation to four lane with Paved shoulder configuration from Existing Km 0000 to Km 39500 design km 0500 to Km 40342, Design length km

of NH 227A near Mehrauna GhatUP Bihar Border to Siwan on the state of Bihar on Hybrid Annuity Model HAM basis

Ministry of Road Transport & HighwaysBiharData: 2026-04
Revised Cost: ₹1661 CrUtilization: 0.0%

Original Cost

₹1661 Cr

Baseline estimate

Revised Cost

₹1661 Cr

Latest approved cost

Expenditure

₹0 Cr

Spent to date

Utilization

0.0%

Of revised cost

Cost Overrun

On Budget

No escalation

Remaining

₹1661 Cr

Budget left

Budget Utilization

Expenditure vs Revised Cost0.0%

Spent

₹0 Cr

Remaining

₹1661 Cr

Total

₹1661 Cr

Budget Split

0.0%

Utilized

SpentRemaining

Project Timeline

Project Approved

Construction / Implementation

Original End Date

2028-03-05

Revised Completion

2028-03-05

Completed

Project Details

Project Code618251
SectorRoads & Highways
MinistryMinistry of Road Transport & Highways
StateBihar
Data Month2026-04

Financial & Timeline

Original Cost₹1661 Cr
Revised Cost₹1661 Cr
Expenditure₹0 Cr
Original End Date2028-03-05
Revised Date2028-03-05

Project Intelligence

1

Project is within original budget of ₹1661 Cr — no cost escalation recorded.

2

Expenditure stands at ₹0 Cr, which is 0.0% of the revised project cost.

3

Remaining budget: ₹1661 Cr. Project is tracked under the DPIIT Investment Project Monitoring system.

4

Sector: Roads & Highways. Ministry: Ministry of Road Transport & Highways.

Frequently Asked Questions

What is IPM project "Improvement and Up gradation to four lane with Paved shoulder configuration from"?
Improvement and Up gradation to four lane with Paved shoulder configuration from Existing Km 0000 to Km 39500 design km 0500 to Km 40342, Design length km of NH 227A near Mehrauna GhatUP Bihar Border to Siwan on the state of Bihar on Hybrid Annuity Model HAM basis is a centrally-funded infrastructure project under the Ministry of Road Transport & Highways, tracked through the Investment Project Monitoring (IPM) system. Sector: Roads & Highways. State: Bihar. Original cost: ₹1661 Cr.
What is the cost overrun for this Bihar IPM project?
The original cost of ₹1661 Cr has not been significantly revised. Expenditure: ₹0 Cr (N/A% of cost). Data as of 2026-04.
Which ministry is responsible for this project?
Improvement and Up gradation to four lane with Paved shoulde is under the Ministry of Road Transport & Highways in the Roads & Highways sector. Project code: 618251. Bihar is one of the states tracked under the central IPM dashboard for this project.
What is the IPM dashboard and what does it track?
The Investment Project Monitoring (IPM) dashboard, maintained by DPIIT (Department for Promotion of Industry and Internal Trade), tracks centrally-funded infrastructure projects worth ₹150 Crore and above. Improvement and Up gradation to four lane with Paved shoulde is one of several Bihar projects tracked under the Roads & Highways sector on the IPM system.

Related Resources

IPM

IPM Central Project Dashboard

All central infrastructure projects in Bihar

Projects

Bihar State Projects

State-funded infrastructure project tracker

NHAI

NHAI Drone Tracker

Real-time NHAI highway construction monitoring

Railway

Bihar Railway Projects

Railway infrastructure project tracker

RCD

Bihar RCD PMIS

State road and bridge project tracker

Tenders

Bihar Government Tenders

Procurement notices for infrastructure projects

Cabinet

Bihar Cabinet Decisions

Policy approvals for infrastructure

EC

EC & Forest Clearances

Environmental clearances for Bihar projects

Upcoming

Upcoming Bihar Projects

Infrastructure pipeline and future projects

Districts

Bihar District Data

District demographics and infrastructure overview