Improvement and Up gradation to four lane with Paved shoulder configuration from Existing Km 0000 to Km 39500 design km 0500 to Km 40342, Design length km of NH 227A near Mehrauna GhatUP Bihar Border to Siwan on the state of Bihar on Hybrid Annuity Model HAM basis
Original Cost
₹1661 Cr
Baseline estimate
Revised Cost
₹1661 Cr
Latest approved cost
Expenditure
₹210 Cr
Spent to date
Utilization
12.6%
Of revised budget
Cost Status
On Budget
No escalation
Remaining
₹1451 Cr
Budget left
Budget Utilization
12.6%Spent
₹210 Cr
Remaining
₹1451 Cr
Total
₹1661 Cr
Budget Split
Project Timeline
Project Approved
Construction / Implementation
Original End Date
05/03/2028
Revised Completion
05/03/2028
Completed
Project Details
Financial Summary
Project Intelligence
Project is within original budget of ₹1661 Cr — no cost escalation recorded.
Expenditure stands at ₹210 Cr, which is 12.6% of the revised project cost.
Remaining budget: ₹1451 Cr. Tracked under the DPIIT Investment Project Monitoring system.
Sector: Roads & Highways. Ministry: Ministry of Road Transport & Highways.
Improvement and Up gradation to four lane with Paved shoulder configuration from Existing Km 0000 to Km 39500 design km 0500 to Km 40342, Design length km of NH 227A near Mehrauna GhatUP Bihar Border to Siwan on the state of Bihar on Hybrid Annuity Model HAM basis is a centrally-funded infrastructure project under Ministry of Road Transport & Highways, in the Roads & Highways sector. The original approved cost is ₹1661.00 Cr.
This project is tracked under the Investment Project Monitoring (IPM) system maintained by DPIIT. Other central projects in the same sector are listed below.
Frequently Asked Questions
- QWhat is IPM project "Improvement and Up gradation to four lane with Paved shoulder configuration from"?
- Improvement and Up gradation to four lane with Paved shoulder configuration from Existing Km 0000 to Km 39500 design km 0500 to Km 40342, Design length km of NH 227A near Mehrauna GhatUP Bihar Border to Siwan on the state of Bihar on Hybrid Annuity Model HAM basis is a centrally-funded infrastructure project under the Ministry of Road Transport & Highways, tracked through the Investment Project Monitoring (IPM) system. Sector: Roads & Highways. State: Bihar. Original cost: ₹1661 Cr.
- QWhat is the cost overrun for this Bihar IPM project?
- The original cost of ₹1661 Cr has not been significantly revised. Expenditure: ₹210 Cr (12.6% of cost). Data as of 2026-08.
- QWhich ministry is responsible for this project?
- Improvement and Up gradation to four lane with Paved shoulde is under the Ministry of Road Transport & Highways in the Roads & Highways sector. Project code: 618251. Bihar is one of the states tracked under the central IPM dashboard for this project.
- QWhat is the IPM dashboard and what does it track?
- The Investment Project Monitoring (IPM) dashboard, maintained by DPIIT (Department for Promotion of Industry and Internal Trade), tracks centrally-funded infrastructure projects worth ₹150 Crore and above. Improvement and Up gradation to four lane with Paved shoulde is one of several Bihar projects tracked under the Roads & Highways sector on the IPM system.