Improvement and up-gradation of NH-227B 84 Kosi Parikrama Marg PackageV, from Design Km.140.960 Patranga to Km.160.200 Bahuvan Madar Majha on EPC mode in the State of Uttar Pradesh
Original Cost
₹1192 Cr
Baseline estimate
Revised Cost
₹1192 Cr
Latest approved cost
Expenditure
₹106 Cr
Spent to date
Utilization
8.9%
Of revised budget
Cost Status
On Budget
No escalation
Remaining
₹1086 Cr
Budget left
Budget Utilization
8.9%Spent
₹106 Cr
Remaining
₹1086 Cr
Total
₹1192 Cr
Budget Split
Project Timeline
Project Approved
Construction / Implementation
Original End Date
10/08/2028
Revised Completion
10/08/2028
Completed
Project Details
Financial Summary
Project Intelligence
Project is within original budget of ₹1192 Cr — no cost escalation recorded.
Expenditure stands at ₹106 Cr, which is 8.9% of the revised project cost.
Remaining budget: ₹1086 Cr. Tracked under the DPIIT Investment Project Monitoring system.
Sector: Roads & Highways. Ministry: Ministry of Road Transport & Highways.
Improvement and up-gradation of NH-227B 84 Kosi Parikrama Marg PackageV, from Design Km.140.960 Patranga to Km.160.200 Bahuvan Madar Majha on EPC mode in the State of Uttar Pradesh is a centrally-funded infrastructure project under Ministry of Road Transport & Highways, in the Roads & Highways sector. The original approved cost is ₹1192.00 Cr.
This project is tracked under the Investment Project Monitoring (IPM) system maintained by DPIIT. Other central projects in the same sector are listed below.
Frequently Asked Questions
- QWhat is IPM project "Improvement and up-gradation of NH-227B 84 Kosi Parikrama Marg PackageV, from De"?
- Improvement and up-gradation of NH-227B 84 Kosi Parikrama Marg PackageV, from Design Km.140.960 Patranga to Km.160.200 Bahuvan Madar Majha on EPC mode in the State of Uttar Pradesh is a centrally-funded infrastructure project under the Ministry of Road Transport & Highways, tracked through the Investment Project Monitoring (IPM) system. Sector: Roads & Highways. State: Uttar Pradesh. Original cost: ₹1192 Cr.
- QWhat is the cost overrun for this Bihar IPM project?
- The original cost of ₹1192 Cr has not been significantly revised. Expenditure: ₹106 Cr (8.9% of cost). Data as of 2026-08.
- QWhich ministry is responsible for this project?
- Improvement and up-gradation of NH-227B 84 Kosi Parikrama Ma is under the Ministry of Road Transport & Highways in the Roads & Highways sector. Project code: 618114. Bihar is one of the states tracked under the central IPM dashboard for this project.
- QWhat is the IPM dashboard and what does it track?
- The Investment Project Monitoring (IPM) dashboard, maintained by DPIIT (Department for Promotion of Industry and Internal Trade), tracks centrally-funded infrastructure projects worth ₹150 Crore and above. Improvement and up-gradation of NH-227B 84 Kosi Parikrama Ma is one of several Bihar projects tracked under the Roads & Highways sector on the IPM system.