Roads & HighwaysIPM · Central Project#618858

Improvement and Up-Gradation of Existing Road to 4L PS from Km 88.750 to 123.650, from Start of Shahjahanpur Bypass to start of Shahabad bypass of NH 731Pkg.-2A

Ministry of Road Transport & HighwaysUttar Pradesh
Revised Cost: ₹955 CrUtilization: 38.9%

Original Cost

₹955 Cr

Baseline estimate

On budget

Revised Cost

₹955 Cr

Latest approved cost

Expenditure

₹371 Cr

Spent to date

Utilization

38.9%

Of revised budget

Stable

Cost Status

On Budget

No escalation

Remaining

₹584 Cr

Budget left

Budget Utilization

38.9%
0%25%50%75%100%

Spent

₹371 Cr

Remaining

₹584 Cr

Total

₹955 Cr

Budget Split

SpentRemaining

Project Timeline

Project Approved

Construction / Implementation

Original End Date

18/01/2026

Revised Completion

31/03/2027

Completed

Project Details

Project Code618858
SectorRoads & Highways
MinistryMinistry of Road Transport & Highways
StateUttar Pradesh
Data Month2026-08

Financial Summary

Original Cost₹955 Cr
Revised Cost₹955 Cr
Expenditure₹371 Cr
Original End Date18/01/2026
Revised Date31/03/2027

Project Intelligence

Project is within original budget of ₹955 Cr — no cost escalation recorded.

Expenditure stands at ₹371 Cr, which is 38.9% of the revised project cost.

Remaining budget: ₹584 Cr. Tracked under the DPIIT Investment Project Monitoring system.

Sector: Roads & Highways. Ministry: Ministry of Road Transport & Highways.

Improvement and Up-Gradation of Existing Road to 4L PS from Km 88.750 to 123.650, from Start of Shahjahanpur Bypass to start of Shahabad bypass of NH 731Pkg.-2A is a centrally-funded infrastructure project under Ministry of Road Transport & Highways, in the Roads & Highways sector. The original approved cost is ₹955.00 Cr, later revised to ₹955.34 Cr.

This project is tracked under the Investment Project Monitoring (IPM) system maintained by DPIIT. Other central projects in the same sector are listed below.

?

Frequently Asked Questions

QWhat is IPM project "Improvement and Up-Gradation of Existing Road to 4L PS from Km 88.750 to 123.650"?
Improvement and Up-Gradation of Existing Road to 4L PS from Km 88.750 to 123.650, from Start of Shahjahanpur Bypass to start of Shahabad bypass of NH 731Pkg.-2A is a centrally-funded infrastructure project under the Ministry of Road Transport & Highways, tracked through the Investment Project Monitoring (IPM) system. Sector: Roads & Highways. State: Uttar Pradesh. Original cost: ₹955 Cr.
QWhat is the cost overrun for this Bihar IPM project?
The original cost of ₹955 Cr has not been significantly revised. Expenditure: ₹371 Cr (38.9% of cost). Data as of 2026-08.
QWhich ministry is responsible for this project?
Improvement and Up-Gradation of Existing Road to 4L PS from is under the Ministry of Road Transport & Highways in the Roads & Highways sector. Project code: 618858. Bihar is one of the states tracked under the central IPM dashboard for this project.
QWhat is the IPM dashboard and what does it track?
The Investment Project Monitoring (IPM) dashboard, maintained by DPIIT (Department for Promotion of Industry and Internal Trade), tracks centrally-funded infrastructure projects worth ₹150 Crore and above. Improvement and Up-Gradation of Existing Road to 4L PS from is one of several Bihar projects tracked under the Roads & Highways sector on the IPM system.