Roads & HighwaysIPM · Central Project#618859

Improvement and Up-Gradation of Existing Road to 4L PS from Km 229.070 to 260.800, End of Hardoi District to Lucknow Ring road of NH 731 Pkg-4

Ministry of Road Transport & HighwaysUttar Pradesh
Revised Cost: ₹554 CrUtilization: 70.5%

Original Cost

₹576 Cr

Baseline estimate

On budget

Revised Cost

₹554 Cr

Latest approved cost

Expenditure

₹391 Cr

Spent to date

Utilization

70.5%

Of revised budget

Stable

Cost Status

On Budget

No escalation

Remaining

₹163 Cr

Budget left

Budget Utilization

70.5%
0%25%50%75%100%

Spent

₹391 Cr

Remaining

₹163 Cr

Total

₹554 Cr

Budget Split

SpentRemaining

Project Timeline

Project Approved

Construction / Implementation

Original End Date

23/10/2024

Revised Completion

30/09/2026

Completed

Project Details

Project Code618859
SectorRoads & Highways
MinistryMinistry of Road Transport & Highways
StateUttar Pradesh
Data Month2026-08

Financial Summary

Original Cost₹576 Cr
Revised Cost₹554 Cr
Expenditure₹391 Cr
Original End Date23/10/2024
Revised Date30/09/2026

Project Intelligence

Project is within original budget of ₹576 Cr — no cost escalation recorded.

Expenditure stands at ₹391 Cr, which is 70.5% of the revised project cost.

Remaining budget: ₹163 Cr. Tracked under the DPIIT Investment Project Monitoring system.

Sector: Roads & Highways. Ministry: Ministry of Road Transport & Highways.

Improvement and Up-Gradation of Existing Road to 4L PS from Km 229.070 to 260.800, End of Hardoi District to Lucknow Ring road of NH 731 Pkg-4 is a centrally-funded infrastructure project under Ministry of Road Transport & Highways, in the Roads & Highways sector. The original approved cost is ₹576.00 Cr.

This project is tracked under the Investment Project Monitoring (IPM) system maintained by DPIIT. Other central projects in the same sector are listed below.

?

Frequently Asked Questions

QWhat is IPM project "Improvement and Up-Gradation of Existing Road to 4L PS from Km 229.070 to 260.80"?
Improvement and Up-Gradation of Existing Road to 4L PS from Km 229.070 to 260.800, End of Hardoi District to Lucknow Ring road of NH 731 Pkg-4 is a centrally-funded infrastructure project under the Ministry of Road Transport & Highways, tracked through the Investment Project Monitoring (IPM) system. Sector: Roads & Highways. State: Uttar Pradesh. Original cost: ₹576 Cr.
QWhat is the cost overrun for this Bihar IPM project?
The original cost was ₹576 Cr and has been revised to ₹554 Cr — a cost overrun of -3.9%. Expenditure to date: ₹391 Cr (70.5% of revised cost). Data as of 2026-08.
QWhich ministry is responsible for this project?
Improvement and Up-Gradation of Existing Road to 4L PS from is under the Ministry of Road Transport & Highways in the Roads & Highways sector. Project code: 618859. Bihar is one of the states tracked under the central IPM dashboard for this project.
QWhat is the IPM dashboard and what does it track?
The Investment Project Monitoring (IPM) dashboard, maintained by DPIIT (Department for Promotion of Industry and Internal Trade), tracks centrally-funded infrastructure projects worth ₹150 Crore and above. Improvement and Up-Gradation of Existing Road to 4L PS from is one of several Bihar projects tracked under the Roads & Highways sector on the IPM system.