Improvement and strengthening of existing 2 lane stretch to 2-Lane with PS 1.5m on both sides on Ghoti-Sinnar section of NH-160A using Thin White Topping 200mm thick in the State Of Maharashtra on EPC Mode
Original Cost
₹255 Cr
Baseline estimate
Revised Cost
₹148 Cr
Latest approved cost
Expenditure
₹119 Cr
Spent to date
Utilization
80.7%
Of revised budget
Cost Status
On Budget
No escalation
Remaining
₹28 Cr
Budget left
Budget Utilization
80.7%Spent
₹119 Cr
Remaining
₹28 Cr
Total
₹148 Cr
Budget Split
Project Timeline
Project Approved
Construction / Implementation
Original End Date
16/06/2026
Revised Completion
31/10/2026
Completed
Project Details
Financial Summary
Project Intelligence
Project is within original budget of ₹255 Cr — no cost escalation recorded.
Expenditure stands at ₹119 Cr, which is 80.7% of the revised project cost.
Remaining budget: ₹28 Cr. Tracked under the DPIIT Investment Project Monitoring system.
Sector: Roads & Highways. Ministry: Ministry of Road Transport & Highways.
Improvement and strengthening of existing 2 lane stretch to 2-Lane with PS 1.5m on both sides on Ghoti-Sinnar section of NH-160A using Thin White Topping 200mm thick in the State Of Maharashtra on EPC Mode is a centrally-funded infrastructure project under Ministry of Road Transport & Highways, in the Roads & Highways sector. The original approved cost is ₹255.00 Cr.
This project is tracked under the Investment Project Monitoring (IPM) system maintained by DPIIT. Other central projects in the same sector are listed below.
Frequently Asked Questions
- QWhat is IPM project "Improvement and strengthening of existing 2 lane stretch to 2-Lane with PS 1.5m "?
- Improvement and strengthening of existing 2 lane stretch to 2-Lane with PS 1.5m on both sides on Ghoti-Sinnar section of NH-160A using Thin White Topping 200mm thick in the State Of Maharashtra on EPC Mode is a centrally-funded infrastructure project under the Ministry of Road Transport & Highways, tracked through the Investment Project Monitoring (IPM) system. Sector: Roads & Highways. State: Maharashtra. Original cost: ₹255 Cr.
- QWhat is the cost overrun for this Bihar IPM project?
- The original cost was ₹255 Cr and has been revised to ₹148 Cr — a cost overrun of -42.1%. Expenditure to date: ₹119 Cr (80.7% of revised cost). Data as of 2026-08.
- QWhich ministry is responsible for this project?
- Improvement and strengthening of existing 2 lane stretch to is under the Ministry of Road Transport & Highways in the Roads & Highways sector. Project code: 618586. Bihar is one of the states tracked under the central IPM dashboard for this project.
- QWhat is the IPM dashboard and what does it track?
- The Investment Project Monitoring (IPM) dashboard, maintained by DPIIT (Department for Promotion of Industry and Internal Trade), tracks centrally-funded infrastructure projects worth ₹150 Crore and above. Improvement and strengthening of existing 2 lane stretch to is one of several Bihar projects tracked under the Roads & Highways sector on the IPM system.