Roads & HighwaysIPM · Central Project#618586

Improvement and strengthening of existing 2 lane stretch to 2-Lane with PS 1.5m on both sides on Ghoti-Sinnar section of NH-160A using Thin White Topping 200mm thick in the State Of Maharashtra on EPC Mode

Ministry of Road Transport & HighwaysMaharashtra
Revised Cost: ₹148 CrUtilization: 80.7%

Original Cost

₹255 Cr

Baseline estimate

On budget

Revised Cost

₹148 Cr

Latest approved cost

Expenditure

₹119 Cr

Spent to date

Utilization

80.7%

Of revised budget

Stable

Cost Status

On Budget

No escalation

Remaining

₹28 Cr

Budget left

Budget Utilization

80.7%
0%25%50%75%100%

Spent

₹119 Cr

Remaining

₹28 Cr

Total

₹148 Cr

Budget Split

SpentRemaining

Project Timeline

Project Approved

Construction / Implementation

Original End Date

16/06/2026

Revised Completion

31/10/2026

Completed

Project Details

Project Code618586
SectorRoads & Highways
MinistryMinistry of Road Transport & Highways
StateMaharashtra
Data Month2026-08

Financial Summary

Original Cost₹255 Cr
Revised Cost₹148 Cr
Expenditure₹119 Cr
Original End Date16/06/2026
Revised Date31/10/2026

Project Intelligence

Project is within original budget of ₹255 Cr — no cost escalation recorded.

Expenditure stands at ₹119 Cr, which is 80.7% of the revised project cost.

Remaining budget: ₹28 Cr. Tracked under the DPIIT Investment Project Monitoring system.

Sector: Roads & Highways. Ministry: Ministry of Road Transport & Highways.

Improvement and strengthening of existing 2 lane stretch to 2-Lane with PS 1.5m on both sides on Ghoti-Sinnar section of NH-160A using Thin White Topping 200mm thick in the State Of Maharashtra on EPC Mode is a centrally-funded infrastructure project under Ministry of Road Transport & Highways, in the Roads & Highways sector. The original approved cost is ₹255.00 Cr.

This project is tracked under the Investment Project Monitoring (IPM) system maintained by DPIIT. Other central projects in the same sector are listed below.

?

Frequently Asked Questions

QWhat is IPM project "Improvement and strengthening of existing 2 lane stretch to 2-Lane with PS 1.5m "?
Improvement and strengthening of existing 2 lane stretch to 2-Lane with PS 1.5m on both sides on Ghoti-Sinnar section of NH-160A using Thin White Topping 200mm thick in the State Of Maharashtra on EPC Mode is a centrally-funded infrastructure project under the Ministry of Road Transport & Highways, tracked through the Investment Project Monitoring (IPM) system. Sector: Roads & Highways. State: Maharashtra. Original cost: ₹255 Cr.
QWhat is the cost overrun for this Bihar IPM project?
The original cost was ₹255 Cr and has been revised to ₹148 Cr — a cost overrun of -42.1%. Expenditure to date: ₹119 Cr (80.7% of revised cost). Data as of 2026-08.
QWhich ministry is responsible for this project?
Improvement and strengthening of existing 2 lane stretch to is under the Ministry of Road Transport & Highways in the Roads & Highways sector. Project code: 618586. Bihar is one of the states tracked under the central IPM dashboard for this project.
QWhat is the IPM dashboard and what does it track?
The Investment Project Monitoring (IPM) dashboard, maintained by DPIIT (Department for Promotion of Industry and Internal Trade), tracks centrally-funded infrastructure projects worth ₹150 Crore and above. Improvement and strengthening of existing 2 lane stretch to is one of several Bihar projects tracked under the Roads & Highways sector on the IPM system.