Gwalior-Sheorpurkalan with extension to Kota 284 km
Original Cost
₹2913 Cr
Baseline estimate
Revised Cost
₹3947 Cr
Latest approved cost
Expenditure
₹3113 Cr
Spent to date
Utilization
78.9%
Of revised budget
Cost Status
+35.5%
+₹1034 Cr increase
Remaining
₹834 Cr
Budget left
Budget Utilization
78.9%Spent
₹3113 Cr
Remaining
₹834 Cr
Total
₹3947 Cr
Budget Split
Cost Escalation Analysis
Original Cost
₹2913 Cr
Revised Cost
₹3947 Cr
Increase
+₹1034 Cr
Escalation
+35.5%
Project Timeline
Project Approved
Construction / Implementation
Original End Date
31/03/2025
Revised Completion
28/02/2026
Completed
Project Details
Financial Summary
Project Intelligence
Cost has increased by ₹1034 Cr (35.5%) from the original estimate of ₹2913 Cr.
Expenditure stands at ₹3113 Cr, which is 78.9% of the revised project cost.
Remaining budget: ₹834 Cr. Tracked under the DPIIT Investment Project Monitoring system.
Sector: Railways. Ministry: Ministry of Railways.
Gwalior-Sheorpurkalan with extension to Kota 284 km is a centrally-funded infrastructure project under Ministry of Railways, in the Railways sector. The original approved cost is ₹2913.00 Cr, later revised to ₹3947.00 Cr.
This project is tracked under the Investment Project Monitoring (IPM) system maintained by DPIIT. Other central projects in the same sector are listed below.
Frequently Asked Questions
- QWhat is IPM project "Gwalior-Sheorpurkalan with extension to Kota 284 km"?
- Gwalior-Sheorpurkalan with extension to Kota 284 km is a centrally-funded infrastructure project under the Ministry of Railways, tracked through the Investment Project Monitoring (IPM) system. Sector: Railways. State: Madhya Pradesh. Original cost: ₹2913 Cr.
- QWhat is the cost overrun for this Bihar IPM project?
- The original cost was ₹2913 Cr and has been revised to ₹3947 Cr — a cost overrun of +35.5%. Expenditure to date: ₹3113 Cr (78.9% of revised cost). Data as of 2026-08.
- QWhich ministry is responsible for this project?
- Gwalior-Sheorpurkalan with extension to Kota 284 km is under the Ministry of Railways in the Railways sector. Project code: 705419. Bihar is one of the states tracked under the central IPM dashboard for this project.
- QWhat is the IPM dashboard and what does it track?
- The Investment Project Monitoring (IPM) dashboard, maintained by DPIIT (Department for Promotion of Industry and Internal Trade), tracks centrally-funded infrastructure projects worth ₹150 Crore and above. Gwalior-Sheorpurkalan with extension to Kota 284 km is one of several Bihar projects tracked under the Railways sector on the IPM system.