Grade separated Interchanges at Km. 113.730 junction with Ranchi Hazaribagh Road & Km. 139.225 junction with Ranchi Jamshedpur road on 4L Ranchi Bypass of NH-33
Original Cost
₹304 Cr
Baseline estimate
Revised Cost
₹6 Cr
Latest approved cost
Expenditure
₹6 Cr
Spent to date
Utilization
107.7%
Of revised budget
Cost Status
On Budget
No escalation
Remaining
₹0 Cr
Budget left
Budget Utilization
107.7%Spent
₹6 Cr
Remaining
₹0 Cr
Total
₹6 Cr
Budget Split
Project Timeline
Project Approved
Construction / Implementation
Original End Date
25/12/2027
Revised Completion
25/12/2027
Completed
Project Details
Financial Summary
Project Intelligence
Project is within original budget of ₹304 Cr — no cost escalation recorded.
Expenditure stands at ₹6 Cr, which is 107.7% of the revised project cost.
Remaining budget: ₹0 Cr. Tracked under the DPIIT Investment Project Monitoring system.
Sector: Roads & Highways. Ministry: Ministry of Road Transport & Highways.
Grade separated Interchanges at Km. 113.730 junction with Ranchi Hazaribagh Road & Km. 139.225 junction with Ranchi Jamshedpur road on 4L Ranchi Bypass of NH-33 is a centrally-funded infrastructure project under Ministry of Road Transport & Highways, in the Roads & Highways sector. The original approved cost is ₹304.00 Cr.
This project is tracked under the Investment Project Monitoring (IPM) system maintained by DPIIT. Other central projects in the same sector are listed below.
Frequently Asked Questions
- QWhat is IPM project "Grade separated Interchanges at Km. 113.730 junction with Ranchi Hazaribagh Roa"?
- Grade separated Interchanges at Km. 113.730 junction with Ranchi Hazaribagh Road & Km. 139.225 junction with Ranchi Jamshedpur road on 4L Ranchi Bypass of NH-33 is a centrally-funded infrastructure project under the Ministry of Road Transport & Highways, tracked through the Investment Project Monitoring (IPM) system. Sector: Roads & Highways. State: Jharkhand. Original cost: ₹304 Cr.
- QWhat is the cost overrun for this Bihar IPM project?
- The original cost was ₹304 Cr and has been revised to ₹6 Cr — a cost overrun of -98.2%. Expenditure to date: ₹6 Cr (107.7% of revised cost). Data as of 2026-08.
- QWhich ministry is responsible for this project?
- Grade separated Interchanges at Km. 113.730 junction with Ra is under the Ministry of Road Transport & Highways in the Roads & Highways sector. Project code: 618737. Bihar is one of the states tracked under the central IPM dashboard for this project.
- QWhat is the IPM dashboard and what does it track?
- The Investment Project Monitoring (IPM) dashboard, maintained by DPIIT (Department for Promotion of Industry and Internal Trade), tracks centrally-funded infrastructure projects worth ₹150 Crore and above. Grade separated Interchanges at Km. 113.730 junction with Ra is one of several Bihar projects tracked under the Roads & Highways sector on the IPM system.