Four Lane Highway from Chandan Nagar Existing Km. 59.025 of NH 530B/Design Km. 179.5000 to Bareilly BypassStartExisting Km. 59.025 of NH 530B/Design Km. 218.000 Section of NH 530B, in the State of Uttar Pradesh on HAM Mode under NH0
Original Cost
₹2077 Cr
Baseline estimate
Revised Cost
₹1112 Cr
Latest approved cost
Expenditure
₹491 Cr
Spent to date
Utilization
44.1%
Of revised budget
Cost Status
On Budget
No escalation
Remaining
₹621 Cr
Budget left
Budget Utilization
44.1%Spent
₹491 Cr
Remaining
₹621 Cr
Total
₹1112 Cr
Budget Split
Project Timeline
Project Approved
Construction / Implementation
Original End Date
18/11/2027
Revised Completion
18/11/2027
Completed
Project Details
Financial Summary
Project Intelligence
Project is within original budget of ₹2077 Cr — no cost escalation recorded.
Expenditure stands at ₹491 Cr, which is 44.1% of the revised project cost.
Remaining budget: ₹621 Cr. Tracked under the DPIIT Investment Project Monitoring system.
Sector: Roads & Highways. Ministry: Ministry of Road Transport & Highways.
Four Lane Highway from Chandan Nagar Existing Km. 59.025 of NH 530B/Design Km. 179.5000 to Bareilly BypassStartExisting Km. 59.025 of NH 530B/Design Km. 218.000 Section of NH 530B, in the State of Uttar Pradesh on HAM Mode under NH0 is a centrally-funded infrastructure project under Ministry of Road Transport & Highways, in the Roads & Highways sector. The original approved cost is ₹2077.00 Cr.
This project is tracked under the Investment Project Monitoring (IPM) system maintained by DPIIT. Other central projects in the same sector are listed below.
Frequently Asked Questions
- QWhat is IPM project "Four Lane Highway from Chandan Nagar Existing Km. 59.025 of NH 530B/Design Km. 1"?
- Four Lane Highway from Chandan Nagar Existing Km. 59.025 of NH 530B/Design Km. 179.5000 to Bareilly BypassStartExisting Km. 59.025 of NH 530B/Design Km. 218.000 Section of NH 530B, in the State of Uttar Pradesh on HAM Mode under NH0 is a centrally-funded infrastructure project under the Ministry of Road Transport & Highways, tracked through the Investment Project Monitoring (IPM) system. Sector: Roads & Highways. State: Uttar Pradesh. Original cost: ₹2077 Cr.
- QWhat is the cost overrun for this Bihar IPM project?
- The original cost was ₹2077 Cr and has been revised to ₹1112 Cr — a cost overrun of -46.4%. Expenditure to date: ₹491 Cr (44.1% of revised cost). Data as of 2026-08.
- QWhich ministry is responsible for this project?
- Four Lane Highway from Chandan Nagar Existing Km. 59.025 of is under the Ministry of Road Transport & Highways in the Roads & Highways sector. Project code: 618866. Bihar is one of the states tracked under the central IPM dashboard for this project.
- QWhat is the IPM dashboard and what does it track?
- The Investment Project Monitoring (IPM) dashboard, maintained by DPIIT (Department for Promotion of Industry and Internal Trade), tracks centrally-funded infrastructure projects worth ₹150 Crore and above. Four Lane Highway from Chandan Nagar Existing Km. 59.025 of is one of several Bihar projects tracked under the Roads & Highways sector on the IPM system.