Roads & HighwaysIPM · Central Project#618866

Four Lane Highway from Chandan Nagar Existing Km. 59.025 of NH 530B/Design Km. 179.5000 to Bareilly BypassStartExisting Km. 59.025 of NH 530B/Design Km. 218.000 Section of NH 530B, in the State of Uttar Pradesh on HAM Mode under NH0

Ministry of Road Transport & HighwaysUttar Pradesh
Revised Cost: ₹1112 CrUtilization: 44.1%

Original Cost

₹2077 Cr

Baseline estimate

On budget

Revised Cost

₹1112 Cr

Latest approved cost

Expenditure

₹491 Cr

Spent to date

Utilization

44.1%

Of revised budget

Stable

Cost Status

On Budget

No escalation

Remaining

₹621 Cr

Budget left

Budget Utilization

44.1%
0%25%50%75%100%

Spent

₹491 Cr

Remaining

₹621 Cr

Total

₹1112 Cr

Budget Split

SpentRemaining

Project Timeline

Project Approved

Construction / Implementation

Original End Date

18/11/2027

Revised Completion

18/11/2027

Completed

Project Details

Project Code618866
SectorRoads & Highways
MinistryMinistry of Road Transport & Highways
StateUttar Pradesh
Data Month2026-08

Financial Summary

Original Cost₹2077 Cr
Revised Cost₹1112 Cr
Expenditure₹491 Cr
Original End Date18/11/2027
Revised Date18/11/2027

Project Intelligence

Project is within original budget of ₹2077 Cr — no cost escalation recorded.

Expenditure stands at ₹491 Cr, which is 44.1% of the revised project cost.

Remaining budget: ₹621 Cr. Tracked under the DPIIT Investment Project Monitoring system.

Sector: Roads & Highways. Ministry: Ministry of Road Transport & Highways.

Four Lane Highway from Chandan Nagar Existing Km. 59.025 of NH 530B/Design Km. 179.5000 to Bareilly BypassStartExisting Km. 59.025 of NH 530B/Design Km. 218.000 Section of NH 530B, in the State of Uttar Pradesh on HAM Mode under NH0 is a centrally-funded infrastructure project under Ministry of Road Transport & Highways, in the Roads & Highways sector. The original approved cost is ₹2077.00 Cr.

This project is tracked under the Investment Project Monitoring (IPM) system maintained by DPIIT. Other central projects in the same sector are listed below.

?

Frequently Asked Questions

QWhat is IPM project "Four Lane Highway from Chandan Nagar Existing Km. 59.025 of NH 530B/Design Km. 1"?
Four Lane Highway from Chandan Nagar Existing Km. 59.025 of NH 530B/Design Km. 179.5000 to Bareilly BypassStartExisting Km. 59.025 of NH 530B/Design Km. 218.000 Section of NH 530B, in the State of Uttar Pradesh on HAM Mode under NH0 is a centrally-funded infrastructure project under the Ministry of Road Transport & Highways, tracked through the Investment Project Monitoring (IPM) system. Sector: Roads & Highways. State: Uttar Pradesh. Original cost: ₹2077 Cr.
QWhat is the cost overrun for this Bihar IPM project?
The original cost was ₹2077 Cr and has been revised to ₹1112 Cr — a cost overrun of -46.4%. Expenditure to date: ₹491 Cr (44.1% of revised cost). Data as of 2026-08.
QWhich ministry is responsible for this project?
Four Lane Highway from Chandan Nagar Existing Km. 59.025 of is under the Ministry of Road Transport & Highways in the Roads & Highways sector. Project code: 618866. Bihar is one of the states tracked under the central IPM dashboard for this project.
QWhat is the IPM dashboard and what does it track?
The Investment Project Monitoring (IPM) dashboard, maintained by DPIIT (Department for Promotion of Industry and Internal Trade), tracks centrally-funded infrastructure projects worth ₹150 Crore and above. Four Lane Highway from Chandan Nagar Existing Km. 59.025 of is one of several Bihar projects tracked under the Roads & Highways sector on the IPM system.