RailwaysIPM · Central Project +121.3% overrun#705373

Fatuah-Islampur incl. material modification for extension of new line from Neora to Daniawan Daniawan to Biharsharif Biharsharif to Barbigha Barbigha to Sheikhpura

Ministry of RailwaysBihar
Revised Cost: ₹3259 CrUtilization: 93.4%Overrun: +₹1786 Cr

Original Cost

₹1473 Cr

Baseline estimate

+121% overrun

Revised Cost

₹3259 Cr

Latest approved cost

Expenditure

₹3045 Cr

Spent to date

Utilization

93.4%

Of revised budget

Escalated

Cost Status

+121.3%

+₹1786 Cr increase

Remaining

₹215 Cr

Budget left

Budget Utilization

93.4%
0%25%50%75%100%

Spent

₹3045 Cr

Remaining

₹215 Cr

Total

₹3259 Cr

Budget Split

SpentRemaining

Cost Escalation Analysis

Original Cost

₹1473 Cr

Revised Cost

₹3259 Cr

Increase

+₹1786 Cr

Escalation

+121.3%

Project Timeline

Project Approved

Construction / Implementation

Original End Date

31/03/2023

Revised Completion

31/08/2025

Completed

Project Details

Project Code705373
SectorRailways
MinistryMinistry of Railways
StateBihar
Data Month2026-08

Financial Summary

Original Cost₹1473 Cr
Revised Cost₹3259 Cr
Expenditure₹3045 Cr
Original End Date31/03/2023
Revised Date31/08/2025

Project Intelligence

Cost has increased by ₹1786 Cr (121.3%) from the original estimate of ₹1473 Cr.

Expenditure stands at ₹3045 Cr, which is 93.4% of the revised project cost.

Remaining budget: ₹215 Cr. Tracked under the DPIIT Investment Project Monitoring system.

Sector: Railways. Ministry: Ministry of Railways.

Fatuah-Islampur incl. material modification for extension of new line from Neora to Daniawan Daniawan to Biharsharif Biharsharif to Barbigha Barbigha to Sheikhpura is a centrally-funded infrastructure project under Ministry of Railways, in the Railways sector. The original approved cost is ₹1473.00 Cr, later revised to ₹3259.35 Cr.

This project is tracked under the Investment Project Monitoring (IPM) system maintained by DPIIT. Other central projects in the same sector are listed below.

?

Frequently Asked Questions

QWhat is IPM project "Fatuah-Islampur incl. material modification for extension of new line from Neora"?
Fatuah-Islampur incl. material modification for extension of new line from Neora to Daniawan Daniawan to Biharsharif Biharsharif to Barbigha Barbigha to Sheikhpura is a centrally-funded infrastructure project under the Ministry of Railways, tracked through the Investment Project Monitoring (IPM) system. Sector: Railways. State: Bihar. Original cost: ₹1473 Cr.
QWhat is the cost overrun for this Bihar IPM project?
The original cost was ₹1473 Cr and has been revised to ₹3259 Cr — a cost overrun of +121.3%. Expenditure to date: ₹3045 Cr (93.4% of revised cost). Data as of 2026-08.
QWhich ministry is responsible for this project?
Fatuah-Islampur incl. material modification for extension of is under the Ministry of Railways in the Railways sector. Project code: 705373. Bihar is one of the states tracked under the central IPM dashboard for this project.
QWhat is the IPM dashboard and what does it track?
The Investment Project Monitoring (IPM) dashboard, maintained by DPIIT (Department for Promotion of Industry and Internal Trade), tracks centrally-funded infrastructure projects worth ₹150 Crore and above. Fatuah-Islampur incl. material modification for extension of is one of several Bihar projects tracked under the Railways sector on the IPM system.