Fatuah-Islampur incl. material modification for extension of new line from Neora to Daniawan Daniawan to Biharsharif Biharsharif to Barbigha Barbigha to Sheikhpura
Original Cost
₹1473 Cr
Baseline estimate
Revised Cost
₹3259 Cr
Latest approved cost
Expenditure
₹3045 Cr
Spent to date
Utilization
93.4%
Of revised budget
Cost Status
+121.3%
+₹1786 Cr increase
Remaining
₹215 Cr
Budget left
Budget Utilization
93.4%Spent
₹3045 Cr
Remaining
₹215 Cr
Total
₹3259 Cr
Budget Split
Cost Escalation Analysis
Original Cost
₹1473 Cr
Revised Cost
₹3259 Cr
Increase
+₹1786 Cr
Escalation
+121.3%
Project Timeline
Project Approved
Construction / Implementation
Original End Date
31/03/2023
Revised Completion
31/08/2025
Completed
Project Details
Financial Summary
Project Intelligence
Cost has increased by ₹1786 Cr (121.3%) from the original estimate of ₹1473 Cr.
Expenditure stands at ₹3045 Cr, which is 93.4% of the revised project cost.
Remaining budget: ₹215 Cr. Tracked under the DPIIT Investment Project Monitoring system.
Sector: Railways. Ministry: Ministry of Railways.
Fatuah-Islampur incl. material modification for extension of new line from Neora to Daniawan Daniawan to Biharsharif Biharsharif to Barbigha Barbigha to Sheikhpura is a centrally-funded infrastructure project under Ministry of Railways, in the Railways sector. The original approved cost is ₹1473.00 Cr, later revised to ₹3259.35 Cr.
This project is tracked under the Investment Project Monitoring (IPM) system maintained by DPIIT. Other central projects in the same sector are listed below.
Frequently Asked Questions
- QWhat is IPM project "Fatuah-Islampur incl. material modification for extension of new line from Neora"?
- Fatuah-Islampur incl. material modification for extension of new line from Neora to Daniawan Daniawan to Biharsharif Biharsharif to Barbigha Barbigha to Sheikhpura is a centrally-funded infrastructure project under the Ministry of Railways, tracked through the Investment Project Monitoring (IPM) system. Sector: Railways. State: Bihar. Original cost: ₹1473 Cr.
- QWhat is the cost overrun for this Bihar IPM project?
- The original cost was ₹1473 Cr and has been revised to ₹3259 Cr — a cost overrun of +121.3%. Expenditure to date: ₹3045 Cr (93.4% of revised cost). Data as of 2026-08.
- QWhich ministry is responsible for this project?
- Fatuah-Islampur incl. material modification for extension of is under the Ministry of Railways in the Railways sector. Project code: 705373. Bihar is one of the states tracked under the central IPM dashboard for this project.
- QWhat is the IPM dashboard and what does it track?
- The Investment Project Monitoring (IPM) dashboard, maintained by DPIIT (Department for Promotion of Industry and Internal Trade), tracks centrally-funded infrastructure projects worth ₹150 Crore and above. Fatuah-Islampur incl. material modification for extension of is one of several Bihar projects tracked under the Railways sector on the IPM system.