Roads & HighwaysIPM · Central Project#618454

Earthwork in Formation, Road Work, Construction of Bridges, Blanketing, P. Way Linking works including Supply of P. Way Fittings and Track Ballast in connection with Construction of Railway Siding from Jogighopa Railway Station to MMLP at Jogighopa from Ch. 00 to 3760 on Item Rate basis Package -3, Railway Siding from Jogighopa Railway Station to MMLP

Ministry of Road Transport & HighwaysAssam
Revised Cost: ₹694 CrUtilization: 5.8%

Original Cost

₹694 Cr

Baseline estimate

On budget

Revised Cost

₹694 Cr

Latest approved cost

Expenditure

₹40 Cr

Spent to date

Utilization

5.8%

Of revised budget

Stable

Cost Status

On Budget

No escalation

Remaining

₹654 Cr

Budget left

Budget Utilization

5.8%
0%25%50%75%100%

Spent

₹40 Cr

Remaining

₹654 Cr

Total

₹694 Cr

Budget Split

SpentRemaining

Project Timeline

Project Approved

Construction / Implementation

Original End Date

01/06/2022

Revised Completion

20/09/2024

Completed

Project Details

Project Code618454
SectorRoads & Highways
MinistryMinistry of Road Transport & Highways
StateAssam
Data Month2026-07

Financial Summary

Original Cost₹694 Cr
Revised Cost₹694 Cr
Expenditure₹40 Cr
Original End Date01/06/2022
Revised Date20/09/2024

Project Intelligence

Project is within original budget of ₹694 Cr — no cost escalation recorded.

Expenditure stands at ₹40 Cr, which is 5.8% of the revised project cost.

Remaining budget: ₹654 Cr. Tracked under the DPIIT Investment Project Monitoring system.

Sector: Roads & Highways. Ministry: Ministry of Road Transport & Highways.

Earthwork in Formation, Road Work, Construction of Bridges, Blanketing, P. Way Linking works including Supply of P. Way Fittings and Track Ballast in connection with Construction of Railway Siding from Jogighopa Railway Station to MMLP at Jogighopa from Ch. 00 to 3760 on Item Rate basis Package -3, Railway Siding from Jogighopa Railway Station to MMLP is a centrally-funded infrastructure project under Ministry of Road Transport & Highways, in the Roads & Highways sector. The original approved cost is ₹694.00 Cr.

This project is tracked under the Investment Project Monitoring (IPM) system maintained by DPIIT. Other central projects in the same sector are listed below.

?

Frequently Asked Questions

QWhat is IPM project "Earthwork in Formation, Road Work, Construction of Bridges, Blanketing, P. Way L"?
Earthwork in Formation, Road Work, Construction of Bridges, Blanketing, P. Way Linking works including Supply of P. Way Fittings and Track Ballast in connection with Construction of Railway Siding from Jogighopa Railway Station to MMLP at Jogighopa from Ch. 00 to 3760 on Item Rate basis Package -3, Railway Siding from Jogighopa Railway Station to MMLP is a centrally-funded infrastructure project under the Ministry of Road Transport & Highways, tracked through the Investment Project Monitoring (IPM) system. Sector: Roads & Highways. State: Assam. Original cost: ₹694 Cr.
QWhat is the cost overrun for this Bihar IPM project?
The original cost of ₹694 Cr has not been significantly revised. Expenditure: ₹40 Cr (5.8% of cost). Data as of 2026-07.
QWhich ministry is responsible for this project?
Earthwork in Formation, Road Work, Construction of Bridges, is under the Ministry of Road Transport & Highways in the Roads & Highways sector. Project code: 618454. Bihar is one of the states tracked under the central IPM dashboard for this project.
QWhat is the IPM dashboard and what does it track?
The Investment Project Monitoring (IPM) dashboard, maintained by DPIIT (Department for Promotion of Industry and Internal Trade), tracks centrally-funded infrastructure projects worth ₹150 Crore and above. Earthwork in Formation, Road Work, Construction of Bridges, is one of several Bihar projects tracked under the Roads & Highways sector on the IPM system.