Duttalur at NH-565 Junction to Kavali Joining on NH-16 Chainage Km. 36/400 to Km. 107/224 excluding the stretch from Km 101.880 to 105.300 67.404 Km of NH-167BG from in the State of Andhra Pradesh on EPC mode
Original Cost
₹424 Cr
Baseline estimate
Revised Cost
₹424 Cr
Latest approved cost
Expenditure
₹0 Cr
Spent to date
Utilization
0.0%
Of revised budget
Cost Status
On Budget
No escalation
Remaining
₹424 Cr
Budget left
Budget Utilization
0.0%Spent
₹0 Cr
Remaining
₹424 Cr
Total
₹424 Cr
Budget Split
Project Timeline
Project Approved
Construction / Implementation
Original End Date
03/07/2024
Revised Completion
30/04/2026
Completed
Project Details
Financial Summary
Project Intelligence
Project is within original budget of ₹424 Cr — no cost escalation recorded.
Expenditure stands at ₹0 Cr, which is 0.0% of the revised project cost.
Remaining budget: ₹424 Cr. Tracked under the DPIIT Investment Project Monitoring system.
Sector: Roads & Highways. Ministry: Ministry of Road Transport & Highways.
Duttalur at NH-565 Junction to Kavali Joining on NH-16 Chainage Km. 36/400 to Km. 107/224 excluding the stretch from Km 101.880 to 105.300 67.404 Km of NH-167BG from in the State of Andhra Pradesh on EPC mode is a centrally-funded infrastructure project under Ministry of Road Transport & Highways, in the Roads & Highways sector. The original approved cost is ₹424.00 Cr.
This project is tracked under the Investment Project Monitoring (IPM) system maintained by DPIIT. Other central projects in the same sector are listed below.
Frequently Asked Questions
- QWhat is IPM project "Duttalur at NH-565 Junction to Kavali Joining on NH-16 Chainage Km. 36/400 to Km"?
- Duttalur at NH-565 Junction to Kavali Joining on NH-16 Chainage Km. 36/400 to Km. 107/224 excluding the stretch from Km 101.880 to 105.300 67.404 Km of NH-167BG from in the State of Andhra Pradesh on EPC mode is a centrally-funded infrastructure project under the Ministry of Road Transport & Highways, tracked through the Investment Project Monitoring (IPM) system. Sector: Roads & Highways. State: Andhra Pradesh. Original cost: ₹424 Cr.
- QWhat is the cost overrun for this Bihar IPM project?
- The original cost of ₹424 Cr has not been significantly revised. Expenditure: ₹0 Cr (N/A% of cost). Data as of 2026-05.
- QWhich ministry is responsible for this project?
- Duttalur at NH-565 Junction to Kavali Joining on NH-16 Chain is under the Ministry of Road Transport & Highways in the Roads & Highways sector. Project code: 618192. Bihar is one of the states tracked under the central IPM dashboard for this project.
- QWhat is the IPM dashboard and what does it track?
- The Investment Project Monitoring (IPM) dashboard, maintained by DPIIT (Department for Promotion of Industry and Internal Trade), tracks centrally-funded infrastructure projects worth ₹150 Crore and above. Duttalur at NH-565 Junction to Kavali Joining on NH-16 Chain is one of several Bihar projects tracked under the Roads & Highways sector on the IPM system.