Development/Widening of Talegaon Chakan Shikrapur Nhavara Section of NH-548D from existing chainage km. 54/000 to 82/300 and Design chainage Km. 54/000 to 82/120 Shikrapur to Nhavara Section to 2LPS/4L Configuration on EPC Mode in the State of Maharashtra.
Original Cost
₹396 Cr
Baseline estimate
Revised Cost
₹396 Cr
Latest approved cost
Expenditure
₹238 Cr
Spent to date
Utilization
60.0%
Of revised budget
Cost Status
On Budget
No escalation
Remaining
₹158 Cr
Budget left
Budget Utilization
60.0%Spent
₹238 Cr
Remaining
₹158 Cr
Total
₹396 Cr
Budget Split
Project Timeline
Project Approved
Construction / Implementation
Original End Date
09/07/2026
Revised Completion
31/03/2027
Completed
Project Details
Financial Summary
Project Intelligence
Project is within original budget of ₹396 Cr — no cost escalation recorded.
Expenditure stands at ₹238 Cr, which is 60.0% of the revised project cost.
Remaining budget: ₹158 Cr. Tracked under the DPIIT Investment Project Monitoring system.
Sector: Roads & Highways. Ministry: Ministry of Road Transport & Highways.
Development/Widening of Talegaon Chakan Shikrapur Nhavara Section of NH-548D from existing chainage km. 54/000 to 82/300 and Design chainage Km. 54/000 to 82/120 Shikrapur to Nhavara Section to 2LPS/4L Configuration on EPC Mode in the State of Maharashtra. is a centrally-funded infrastructure project under Ministry of Road Transport & Highways, in the Roads & Highways sector. The original approved cost is ₹396.00 Cr.
This project is tracked under the Investment Project Monitoring (IPM) system maintained by DPIIT. Other central projects in the same sector are listed below.
Frequently Asked Questions
- QWhat is IPM project "Development/Widening of Talegaon Chakan Shikrapur Nhavara Section of NH-548D fro"?
- Development/Widening of Talegaon Chakan Shikrapur Nhavara Section of NH-548D from existing chainage km. 54/000 to 82/300 and Design chainage Km. 54/000 to 82/120 Shikrapur to Nhavara Section to 2LPS/4L Configuration on EPC Mode in the State of Maharashtra. is a centrally-funded infrastructure project under the Ministry of Road Transport & Highways, tracked through the Investment Project Monitoring (IPM) system. Sector: Roads & Highways. State: Maharashtra. Original cost: ₹396 Cr.
- QWhat is the cost overrun for this Bihar IPM project?
- The original cost of ₹396 Cr has not been significantly revised. Expenditure: ₹238 Cr (60.0% of cost). Data as of 2026-08.
- QWhich ministry is responsible for this project?
- Development/Widening of Talegaon Chakan Shikrapur Nhavara Se is under the Ministry of Road Transport & Highways in the Roads & Highways sector. Project code: 618155. Bihar is one of the states tracked under the central IPM dashboard for this project.
- QWhat is the IPM dashboard and what does it track?
- The Investment Project Monitoring (IPM) dashboard, maintained by DPIIT (Department for Promotion of Industry and Internal Trade), tracks centrally-funded infrastructure projects worth ₹150 Crore and above. Development/Widening of Talegaon Chakan Shikrapur Nhavara Se is one of several Bihar projects tracked under the Roads & Highways sector on the IPM system.