Original Cost
₹466 Cr
Baseline estimate
Revised Cost
₹619 Cr
Latest approved cost
Expenditure
₹586 Cr
Spent to date
Utilization
94.7%
Of revised budget
Cost Status
+32.9%
+₹153 Cr increase
Remaining
₹33 Cr
Budget left
Budget Utilization
94.7%Spent
₹586 Cr
Remaining
₹33 Cr
Total
₹619 Cr
Budget Split
Cost Escalation Analysis
Original Cost
₹466 Cr
Revised Cost
₹619 Cr
Increase
+₹153 Cr
Escalation
+32.9%
Project Timeline
Project Approved
Construction / Implementation
Original End Date
30/11/2026
Revised Completion
Completed
Project Details
Financial Summary
Project Intelligence
Cost has increased by ₹153 Cr (32.9%) from the original estimate of ₹466 Cr.
Expenditure stands at ₹586 Cr, which is 94.7% of the revised project cost.
Remaining budget: ₹33 Cr. Tracked under the DPIIT Investment Project Monitoring system.
Sector: Railways. Ministry: Ministry of Railways.
Dedicatedtest track for RDSO Phase-2 34 km Umbrella work PB22/2019-20/NR is a centrally-funded infrastructure project under Ministry of Railways, in the Railways sector. The original approved cost is ₹466.00 Cr, later revised to ₹619.19 Cr.
This project is tracked under the Investment Project Monitoring (IPM) system maintained by DPIIT. Other central projects in the same sector are listed below.
Frequently Asked Questions
- QWhat is IPM project "Dedicatedtest track for RDSO Phase-2 34 km Umbrella work PB22/2019-20/NR"?
- Dedicatedtest track for RDSO Phase-2 34 km Umbrella work PB22/2019-20/NR is a centrally-funded infrastructure project under the Ministry of Railways, tracked through the Investment Project Monitoring (IPM) system. Sector: Railways. State: Rajasthan. Original cost: ₹466 Cr.
- QWhat is the cost overrun for this Bihar IPM project?
- The original cost was ₹466 Cr and has been revised to ₹619 Cr — a cost overrun of +32.9%. Expenditure to date: ₹586 Cr (94.7% of revised cost). Data as of 2026-08.
- QWhich ministry is responsible for this project?
- Dedicatedtest track for RDSO Phase-2 34 km Umbrella work PB2 is under the Ministry of Railways in the Railways sector. Project code: 706836. Bihar is one of the states tracked under the central IPM dashboard for this project.
- QWhat is the IPM dashboard and what does it track?
- The Investment Project Monitoring (IPM) dashboard, maintained by DPIIT (Department for Promotion of Industry and Internal Trade), tracks centrally-funded infrastructure projects worth ₹150 Crore and above. Dedicatedtest track for RDSO Phase-2 34 km Umbrella work PB2 is one of several Bihar projects tracked under the Railways sector on the IPM system.