Construction & Upgradation to 2-lane with paved shoulder from Design Ch. Km 51700 at Premnagar km 66315 to Km 66535 New Thatri at Start of Km 83rd, Tunnel Km 82665 of 14.835 Km design length on Chenani-Sudhmahadev-Goha Khellani-Kishtwar-Vailoo Donipawa-Ashajipora section of NH-244 in the UT of J&K on EPC Mode under NHO-Gen Pkg - 2
Original Cost
₹512 Cr
Baseline estimate
Revised Cost
₹512 Cr
Latest approved cost
Expenditure
₹165 Cr
Spent to date
Utilization
32.2%
Of revised budget
Cost Status
On Budget
No escalation
Remaining
₹347 Cr
Budget left
Budget Utilization
32.2%Spent
₹165 Cr
Remaining
₹347 Cr
Total
₹512 Cr
Budget Split
Project Timeline
Project Approved
Construction / Implementation
Original End Date
24/02/2023
Revised Completion
30/06/2027
Completed
Project Details
Financial Summary
Project Intelligence
Project is within original budget of ₹512 Cr — no cost escalation recorded.
Expenditure stands at ₹165 Cr, which is 32.2% of the revised project cost.
Remaining budget: ₹347 Cr. Tracked under the DPIIT Investment Project Monitoring system.
Sector: Roads & Highways. Ministry: Ministry of Road Transport & Highways.
Construction & Upgradation to 2-lane with paved shoulder from Design Ch. Km 51700 at Premnagar km 66315 to Km 66535 New Thatri at Start of Km 83rd, Tunnel Km 82665 of 14.835 Km design length on Chenani-Sudhmahadev-Goha Khellani-Kishtwar-Vailoo Donipawa-Ashajipora section of NH-244 in the UT of J&K on EPC Mode under NHO-Gen Pkg - 2 is a centrally-funded infrastructure project under Ministry of Road Transport & Highways, in the Roads & Highways sector. The original approved cost is ₹512.00 Cr.
This project is tracked under the Investment Project Monitoring (IPM) system maintained by DPIIT. Other central projects in the same sector are listed below.
Frequently Asked Questions
- QWhat is IPM project "Construction & Upgradation to 2-lane with paved shoulder from Design Ch. Km 5170"?
- Construction & Upgradation to 2-lane with paved shoulder from Design Ch. Km 51700 at Premnagar km 66315 to Km 66535 New Thatri at Start of Km 83rd, Tunnel Km 82665 of 14.835 Km design length on Chenani-Sudhmahadev-Goha Khellani-Kishtwar-Vailoo Donipawa-Ashajipora section of NH-244 in the UT of J&K on EPC Mode under NHO-Gen Pkg - 2 is a centrally-funded infrastructure project under the Ministry of Road Transport & Highways, tracked through the Investment Project Monitoring (IPM) system. Sector: Roads & Highways. State: Jammu & Kashmir. Original cost: ₹512 Cr.
- QWhat is the cost overrun for this Bihar IPM project?
- The original cost of ₹512 Cr has not been significantly revised. Expenditure: ₹165 Cr (32.2% of cost). Data as of 2026-08.
- QWhich ministry is responsible for this project?
- Construction & Upgradation to 2-lane with paved shoulder fro is under the Ministry of Road Transport & Highways in the Roads & Highways sector. Project code: 618395. Bihar is one of the states tracked under the central IPM dashboard for this project.
- QWhat is the IPM dashboard and what does it track?
- The Investment Project Monitoring (IPM) dashboard, maintained by DPIIT (Department for Promotion of Industry and Internal Trade), tracks centrally-funded infrastructure projects worth ₹150 Crore and above. Construction & Upgradation to 2-lane with paved shoulder fro is one of several Bihar projects tracked under the Roads & Highways sector on the IPM system.