Roads & HighwaysIPM · Central Project#618209

Construction & up gradation of existing road to 2-Lane with paved shoulder from existing chainage km 468000 to km 489350 Design Chainage km 465150 to km 471500 of NH-07 Old NH-58 including Joshimath bypass on EPC mode in the state of Uttarakhand Length 6.35 km

Ministry of Road Transport & HighwaysUttarakhand
Revised Cost: ₹259 CrUtilization: 32.8%

Original Cost

₹259 Cr

Baseline estimate

On budget

Revised Cost

₹259 Cr

Latest approved cost

Expenditure

₹85 Cr

Spent to date

Utilization

32.8%

Of revised budget

Stable

Cost Status

On Budget

No escalation

Remaining

₹174 Cr

Budget left

Budget Utilization

32.8%
0%25%50%75%100%

Spent

₹85 Cr

Remaining

₹174 Cr

Total

₹259 Cr

Budget Split

SpentRemaining

Project Timeline

Project Approved

Construction / Implementation

Original End Date

13/09/2025

Revised Completion

27/08/2027

Completed

Project Details

Project Code618209
SectorRoads & Highways
MinistryMinistry of Road Transport & Highways
StateUttarakhand
Data Month2026-08

Financial Summary

Original Cost₹259 Cr
Revised Cost₹259 Cr
Expenditure₹85 Cr
Original End Date13/09/2025
Revised Date27/08/2027

Project Intelligence

Project is within original budget of ₹259 Cr — no cost escalation recorded.

Expenditure stands at ₹85 Cr, which is 32.8% of the revised project cost.

Remaining budget: ₹174 Cr. Tracked under the DPIIT Investment Project Monitoring system.

Sector: Roads & Highways. Ministry: Ministry of Road Transport & Highways.

Construction & up gradation of existing road to 2-Lane with paved shoulder from existing chainage km 468000 to km 489350 Design Chainage km 465150 to km 471500 of NH-07 Old NH-58 including Joshimath bypass on EPC mode in the state of Uttarakhand Length 6.35 km is a centrally-funded infrastructure project under Ministry of Road Transport & Highways, in the Roads & Highways sector. The original approved cost is ₹259.00 Cr.

This project is tracked under the Investment Project Monitoring (IPM) system maintained by DPIIT. Other central projects in the same sector are listed below.

?

Frequently Asked Questions

QWhat is IPM project "Construction & up gradation of existing road to 2-Lane with paved shoulder from "?
Construction & up gradation of existing road to 2-Lane with paved shoulder from existing chainage km 468000 to km 489350 Design Chainage km 465150 to km 471500 of NH-07 Old NH-58 including Joshimath bypass on EPC mode in the state of Uttarakhand Length 6.35 km is a centrally-funded infrastructure project under the Ministry of Road Transport & Highways, tracked through the Investment Project Monitoring (IPM) system. Sector: Roads & Highways. State: Uttarakhand. Original cost: ₹259 Cr.
QWhat is the cost overrun for this Bihar IPM project?
The original cost of ₹259 Cr has not been significantly revised. Expenditure: ₹85 Cr (32.8% of cost). Data as of 2026-08.
QWhich ministry is responsible for this project?
Construction & up gradation of existing road to 2-Lane with is under the Ministry of Road Transport & Highways in the Roads & Highways sector. Project code: 618209. Bihar is one of the states tracked under the central IPM dashboard for this project.
QWhat is the IPM dashboard and what does it track?
The Investment Project Monitoring (IPM) dashboard, maintained by DPIIT (Department for Promotion of Industry and Internal Trade), tracks centrally-funded infrastructure projects worth ₹150 Crore and above. Construction & up gradation of existing road to 2-Lane with is one of several Bihar projects tracked under the Roads & Highways sector on the IPM system.