Construction or 4 lane Raniganj Bypass of length 5.261 km on NH-60 new NH-14 from km 273.00 of NH to km 478.18 of NH-2 New NH 16 in paschim Bardhaman, West Bengal in EPC Mode- reg. Job No. 014-WB-2022-23/514
Original Cost
₹411 Cr
Baseline estimate
Revised Cost
₹411 Cr
Latest approved cost
Expenditure
₹271 Cr
Spent to date
Utilization
65.8%
Of revised budget
Cost Status
On Budget
No escalation
Remaining
₹140 Cr
Budget left
Budget Utilization
65.8%Spent
₹271 Cr
Remaining
₹140 Cr
Total
₹411 Cr
Budget Split
Project Timeline
Project Approved
Construction / Implementation
Original End Date
08/03/2026
Revised Completion
05/05/2027
Completed
Project Details
Financial Summary
Project Intelligence
Project is within original budget of ₹411 Cr — no cost escalation recorded.
Expenditure stands at ₹271 Cr, which is 65.8% of the revised project cost.
Remaining budget: ₹140 Cr. Tracked under the DPIIT Investment Project Monitoring system.
Sector: Roads & Highways. Ministry: Ministry of Road Transport & Highways.
Construction or 4 lane Raniganj Bypass of length 5.261 km on NH-60 new NH-14 from km 273.00 of NH to km 478.18 of NH-2 New NH 16 in paschim Bardhaman, West Bengal in EPC Mode- reg. Job No. 014-WB-2022-23/514 is a centrally-funded infrastructure project under Ministry of Road Transport & Highways, in the Roads & Highways sector. The original approved cost is ₹411.00 Cr.
This project is tracked under the Investment Project Monitoring (IPM) system maintained by DPIIT. Other central projects in the same sector are listed below.
Frequently Asked Questions
- QWhat is IPM project "Construction or 4 lane Raniganj Bypass of length 5.261 km on NH-60 new NH-14 "?
- Construction or 4 lane Raniganj Bypass of length 5.261 km on NH-60 new NH-14 from km 273.00 of NH to km 478.18 of NH-2 New NH 16 in paschim Bardhaman, West Bengal in EPC Mode- reg. Job No. 014-WB-2022-23/514 is a centrally-funded infrastructure project under the Ministry of Road Transport & Highways, tracked through the Investment Project Monitoring (IPM) system. Sector: Roads & Highways. State: West Bengal. Original cost: ₹411 Cr.
- QWhat is the cost overrun for this Bihar IPM project?
- The original cost of ₹411 Cr has not been significantly revised. Expenditure: ₹271 Cr (65.8% of cost). Data as of 2026-08.
- QWhich ministry is responsible for this project?
- Construction or 4 lane Raniganj Bypass of length 5.261 km on is under the Ministry of Road Transport & Highways in the Roads & Highways sector. Project code: 617894. Bihar is one of the states tracked under the central IPM dashboard for this project.
- QWhat is the IPM dashboard and what does it track?
- The Investment Project Monitoring (IPM) dashboard, maintained by DPIIT (Department for Promotion of Industry and Internal Trade), tracks centrally-funded infrastructure projects worth ₹150 Crore and above. Construction or 4 lane Raniganj Bypass of length 5.261 km on is one of several Bihar projects tracked under the Roads & Highways sector on the IPM system.