Construction, Operation & Maintenance of 2-L Bi-directional Silkyara Bend- Barkot Tunnel with escape passage including approaches Tunnel-4.531 & Approach road- 0.328 on Dharasu-Yamunotri section b/w Chainage 25.400km and 51.00km falling along NH-134 Old NH-94 on EPC mode
Original Cost
₹1384 Cr
Baseline estimate
Revised Cost
₹1384 Cr
Latest approved cost
Expenditure
₹861 Cr
Spent to date
Utilization
62.2%
Of revised budget
Cost Status
On Budget
No escalation
Remaining
₹523 Cr
Budget left
Budget Utilization
62.2%Spent
₹861 Cr
Remaining
₹523 Cr
Total
₹1384 Cr
Budget Split
Project Timeline
Project Approved
Construction / Implementation
Original End Date
08/07/2022
Revised Completion
31/03/2027
Completed
Project Details
Financial Summary
Project Intelligence
Project is within original budget of ₹1384 Cr — no cost escalation recorded.
Expenditure stands at ₹861 Cr, which is 62.2% of the revised project cost.
Remaining budget: ₹523 Cr. Tracked under the DPIIT Investment Project Monitoring system.
Sector: Roads & Highways. Ministry: Ministry of Road Transport & Highways.
Construction, Operation & Maintenance of 2-L Bi-directional Silkyara Bend- Barkot Tunnel with escape passage including approaches Tunnel-4.531 & Approach road- 0.328 on Dharasu-Yamunotri section b/w Chainage 25.400km and 51.00km falling along NH-134 Old NH-94 on EPC mode is a centrally-funded infrastructure project under Ministry of Road Transport & Highways, in the Roads & Highways sector. The original approved cost is ₹1384.00 Cr.
This project is tracked under the Investment Project Monitoring (IPM) system maintained by DPIIT. Other central projects in the same sector are listed below.
Frequently Asked Questions
- QWhat is IPM project "Construction, Operation & Maintenance of 2-L Bi-directional Silkyara Bend- Barko"?
- Construction, Operation & Maintenance of 2-L Bi-directional Silkyara Bend- Barkot Tunnel with escape passage including approaches Tunnel-4.531 & Approach road- 0.328 on Dharasu-Yamunotri section b/w Chainage 25.400km and 51.00km falling along NH-134 Old NH-94 on EPC mode is a centrally-funded infrastructure project under the Ministry of Road Transport & Highways, tracked through the Investment Project Monitoring (IPM) system. Sector: Roads & Highways. State: Uttarakhand. Original cost: ₹1384 Cr.
- QWhat is the cost overrun for this Bihar IPM project?
- The original cost of ₹1384 Cr has not been significantly revised. Expenditure: ₹861 Cr (62.2% of cost). Data as of 2026-08.
- QWhich ministry is responsible for this project?
- Construction, Operation & Maintenance of 2-L Bi-directional is under the Ministry of Road Transport & Highways in the Roads & Highways sector. Project code: 618390. Bihar is one of the states tracked under the central IPM dashboard for this project.
- QWhat is the IPM dashboard and what does it track?
- The Investment Project Monitoring (IPM) dashboard, maintained by DPIIT (Department for Promotion of Industry and Internal Trade), tracks centrally-funded infrastructure projects worth ₹150 Crore and above. Construction, Operation & Maintenance of 2-L Bi-directional is one of several Bihar projects tracked under the Roads & Highways sector on the IPM system.