Roads & HighwaysIPM · Central Project#617891

Construction of Two lane with Paved Shoulder for Fatehpur Bypass Design Km 0.000 to Km 7.400 , Mandawa Bypass Design Km 20.925 to Km 27.300 & Jhunjhunu Bypass Design Km 41.625 to Km 54.689 of NH-11 on EPC Mode in the state of Rajasthan .

Ministry of Road Transport & HighwaysRajasthan
Revised Cost: ₹186 CrUtilization: 35.9%

Original Cost

₹186 Cr

Baseline estimate

On budget

Revised Cost

₹186 Cr

Latest approved cost

Expenditure

₹67 Cr

Spent to date

Utilization

35.9%

Of revised budget

Stable

Cost Status

On Budget

No escalation

Remaining

₹119 Cr

Budget left

Budget Utilization

35.9%
0%25%50%75%100%

Spent

₹67 Cr

Remaining

₹119 Cr

Total

₹186 Cr

Budget Split

SpentRemaining

Project Timeline

Project Approved

Construction / Implementation

Original End Date

13/08/2024

Revised Completion

31/08/2025

Completed

Project Details

Project Code617891
SectorRoads & Highways
MinistryMinistry of Road Transport & Highways
StateRajasthan
Data Month2026-05

Financial Summary

Original Cost₹186 Cr
Revised Cost₹186 Cr
Expenditure₹67 Cr
Original End Date13/08/2024
Revised Date31/08/2025

Project Intelligence

Project is within original budget of ₹186 Cr — no cost escalation recorded.

Expenditure stands at ₹67 Cr, which is 35.9% of the revised project cost.

Remaining budget: ₹119 Cr. Tracked under the DPIIT Investment Project Monitoring system.

Sector: Roads & Highways. Ministry: Ministry of Road Transport & Highways.

Construction of Two lane with Paved Shoulder for Fatehpur Bypass Design Km 0.000 to Km 7.400 , Mandawa Bypass Design Km 20.925 to Km 27.300 & Jhunjhunu Bypass Design Km 41.625 to Km 54.689 of NH-11 on EPC Mode in the state of Rajasthan . is a centrally-funded infrastructure project under Ministry of Road Transport & Highways, in the Roads & Highways sector. The original approved cost is ₹186.00 Cr.

This project is tracked under the Investment Project Monitoring (IPM) system maintained by DPIIT. Other central projects in the same sector are listed below.

?

Frequently Asked Questions

QWhat is IPM project "Construction of Two lane with Paved Shoulder for Fatehpur Bypass Design Km 0.000"?
Construction of Two lane with Paved Shoulder for Fatehpur Bypass Design Km 0.000 to Km 7.400 , Mandawa Bypass Design Km 20.925 to Km 27.300 & Jhunjhunu Bypass Design Km 41.625 to Km 54.689 of NH-11 on EPC Mode in the state of Rajasthan . is a centrally-funded infrastructure project under the Ministry of Road Transport & Highways, tracked through the Investment Project Monitoring (IPM) system. Sector: Roads & Highways. State: Rajasthan. Original cost: ₹186 Cr.
QWhat is the cost overrun for this Bihar IPM project?
The original cost of ₹186 Cr has not been significantly revised. Expenditure: ₹67 Cr (35.9% of cost). Data as of 2026-05.
QWhich ministry is responsible for this project?
Construction of Two lane with Paved Shoulder for Fatehpur By is under the Ministry of Road Transport & Highways in the Roads & Highways sector. Project code: 617891. Bihar is one of the states tracked under the central IPM dashboard for this project.
QWhat is the IPM dashboard and what does it track?
The Investment Project Monitoring (IPM) dashboard, maintained by DPIIT (Department for Promotion of Industry and Internal Trade), tracks centrally-funded infrastructure projects worth ₹150 Crore and above. Construction of Two lane with Paved Shoulder for Fatehpur By is one of several Bihar projects tracked under the Roads & Highways sector on the IPM system.