Roads & HighwaysIPM · Central Project#618170

Construction of Two lane with paved shoulder configuration of Shujalpur Bypass section of NH-752C from km 33100 Design to km. 42570 Design total design length 10.470 km in the State of Madhya Pradesh on EPC mode.

Ministry of Road Transport & HighwaysMadhya Pradesh
Revised Cost: ₹214 CrUtilization: 32.6%

Original Cost

₹214 Cr

Baseline estimate

On budget

Revised Cost

₹214 Cr

Latest approved cost

Expenditure

₹70 Cr

Spent to date

Utilization

32.6%

Of revised budget

Stable

Cost Status

On Budget

No escalation

Remaining

₹144 Cr

Budget left

Budget Utilization

32.6%
0%25%50%75%100%

Spent

₹70 Cr

Remaining

₹144 Cr

Total

₹214 Cr

Budget Split

SpentRemaining

Project Timeline

Project Approved

Construction / Implementation

Original End Date

14/09/2025

Revised Completion

31/12/2026

Completed

Project Details

Project Code618170
SectorRoads & Highways
MinistryMinistry of Road Transport & Highways
StateMadhya Pradesh
Data Month2026-08

Financial Summary

Original Cost₹214 Cr
Revised Cost₹214 Cr
Expenditure₹70 Cr
Original End Date14/09/2025
Revised Date31/12/2026

Project Intelligence

Project is within original budget of ₹214 Cr — no cost escalation recorded.

Expenditure stands at ₹70 Cr, which is 32.6% of the revised project cost.

Remaining budget: ₹144 Cr. Tracked under the DPIIT Investment Project Monitoring system.

Sector: Roads & Highways. Ministry: Ministry of Road Transport & Highways.

Construction of Two lane with paved shoulder configuration of Shujalpur Bypass section of NH-752C from km 33100 Design to km. 42570 Design total design length 10.470 km in the State of Madhya Pradesh on EPC mode. is a centrally-funded infrastructure project under Ministry of Road Transport & Highways, in the Roads & Highways sector. The original approved cost is ₹214.00 Cr.

This project is tracked under the Investment Project Monitoring (IPM) system maintained by DPIIT. Other central projects in the same sector are listed below.

?

Frequently Asked Questions

QWhat is IPM project "Construction of Two lane with paved shoulder configuration of Shujalpur Bypass s"?
Construction of Two lane with paved shoulder configuration of Shujalpur Bypass section of NH-752C from km 33100 Design to km. 42570 Design total design length 10.470 km in the State of Madhya Pradesh on EPC mode. is a centrally-funded infrastructure project under the Ministry of Road Transport & Highways, tracked through the Investment Project Monitoring (IPM) system. Sector: Roads & Highways. State: Madhya Pradesh. Original cost: ₹214 Cr.
QWhat is the cost overrun for this Bihar IPM project?
The original cost of ₹214 Cr has not been significantly revised. Expenditure: ₹70 Cr (32.6% of cost). Data as of 2026-08.
QWhich ministry is responsible for this project?
Construction of Two lane with paved shoulder configuration o is under the Ministry of Road Transport & Highways in the Roads & Highways sector. Project code: 618170. Bihar is one of the states tracked under the central IPM dashboard for this project.
QWhat is the IPM dashboard and what does it track?
The Investment Project Monitoring (IPM) dashboard, maintained by DPIIT (Department for Promotion of Industry and Internal Trade), tracks centrally-funded infrastructure projects worth ₹150 Crore and above. Construction of Two lane with paved shoulder configuration o is one of several Bihar projects tracked under the Roads & Highways sector on the IPM system.