Construction of Twin Tube Uni-directional Aizawl Bypass Tunnel of 2.5 km and its approaches of 2.1 km from km 10.600 to km 15.200 on Sarrang - Phaibawk section of NH-6 in the State of Mizoram on EPC Mode under NHO-NE Package-2
Original Cost
₹1313 Cr
Baseline estimate
Revised Cost
₹1313 Cr
Latest approved cost
Expenditure
₹0 Cr
Spent to date
Utilization
0.0%
Of revised budget
Cost Status
On Budget
No escalation
Remaining
₹1313 Cr
Budget left
Budget Utilization
0.0%Spent
₹0 Cr
Remaining
₹1313 Cr
Total
₹1313 Cr
Budget Split
Project Timeline
Project Approved
Construction / Implementation
Original End Date
02/12/2028
Revised Completion
Completed
Project Details
Financial Summary
Project Intelligence
Project is within original budget of ₹1313 Cr — no cost escalation recorded.
Expenditure stands at ₹0 Cr, which is 0.0% of the revised project cost.
Remaining budget: ₹1313 Cr. Tracked under the DPIIT Investment Project Monitoring system.
Sector: Roads & Highways. Ministry: Ministry of Road Transport & Highways.
Construction of Twin Tube Uni-directional Aizawl Bypass Tunnel of 2.5 km and its approaches of 2.1 km from km 10.600 to km 15.200 on Sarrang - Phaibawk section of NH-6 in the State of Mizoram on EPC Mode under NHO-NE Package-2 is a centrally-funded infrastructure project under Ministry of Road Transport & Highways, in the Roads & Highways sector. The original approved cost is ₹1313.00 Cr.
This project is tracked under the Investment Project Monitoring (IPM) system maintained by DPIIT. Other central projects in the same sector are listed below.
Frequently Asked Questions
- QWhat is IPM project "Construction of Twin Tube Uni-directional Aizawl Bypass Tunnel of 2.5 km and its"?
- Construction of Twin Tube Uni-directional Aizawl Bypass Tunnel of 2.5 km and its approaches of 2.1 km from km 10.600 to km 15.200 on Sarrang - Phaibawk section of NH-6 in the State of Mizoram on EPC Mode under NHO-NE Package-2 is a centrally-funded infrastructure project under the Ministry of Road Transport & Highways, tracked through the Investment Project Monitoring (IPM) system. Sector: Roads & Highways. State: Mizoram. Original cost: ₹1313 Cr.
- QWhat is the cost overrun for this Bihar IPM project?
- The original cost of ₹1313 Cr has not been significantly revised. Expenditure: ₹0 Cr (0.0% of cost). Data as of 2026-08.
- QWhich ministry is responsible for this project?
- Construction of Twin Tube Uni-directional Aizawl Bypass Tunn is under the Ministry of Road Transport & Highways in the Roads & Highways sector. Project code: 618323. Bihar is one of the states tracked under the central IPM dashboard for this project.
- QWhat is the IPM dashboard and what does it track?
- The Investment Project Monitoring (IPM) dashboard, maintained by DPIIT (Department for Promotion of Industry and Internal Trade), tracks centrally-funded infrastructure projects worth ₹150 Crore and above. Construction of Twin Tube Uni-directional Aizawl Bypass Tunn is one of several Bihar projects tracked under the Roads & Highways sector on the IPM system.