Construction of twin tube tunnels on Jammu Kashmir Ring Road NH-244A Between Design Ch. 50600 to 51700 and design Ch. 53535 to 55700 on EPC mode under residual NHDP component of Bharatmala Pariyojna
Original Cost
₹243 Cr
Baseline estimate
Revised Cost
₹732 Cr
Latest approved cost
Expenditure
₹679 Cr
Spent to date
Utilization
92.7%
Of revised budget
Cost Status
+201.1%
+₹489 Cr increase
Remaining
₹53 Cr
Budget left
Budget Utilization
92.7%Spent
₹679 Cr
Remaining
₹53 Cr
Total
₹732 Cr
Budget Split
Cost Escalation Analysis
Original Cost
₹243 Cr
Revised Cost
₹732 Cr
Increase
+₹489 Cr
Escalation
+201.1%
Project Timeline
Project Approved
Construction / Implementation
Original End Date
07/06/2025
Revised Completion
31/12/2026
Completed
Project Details
Financial Summary
Project Intelligence
Cost has increased by ₹489 Cr (201.1%) from the original estimate of ₹243 Cr.
Expenditure stands at ₹679 Cr, which is 92.7% of the revised project cost.
Remaining budget: ₹53 Cr. Tracked under the DPIIT Investment Project Monitoring system.
Sector: Roads & Highways. Ministry: Ministry of Road Transport & Highways.
Construction of twin tube tunnels on Jammu Kashmir Ring Road NH-244A Between Design Ch. 50600 to 51700 and design Ch. 53535 to 55700 on EPC mode under residual NHDP component of Bharatmala Pariyojna is a centrally-funded infrastructure project under Ministry of Road Transport & Highways, in the Roads & Highways sector. The original approved cost is ₹243.00 Cr, later revised to ₹731.59 Cr.
This project is tracked under the Investment Project Monitoring (IPM) system maintained by DPIIT. Other central projects in the same sector are listed below.
Frequently Asked Questions
- QWhat is IPM project "Construction of twin tube tunnels on Jammu Kashmir Ring Road NH-244A Between Des"?
- Construction of twin tube tunnels on Jammu Kashmir Ring Road NH-244A Between Design Ch. 50600 to 51700 and design Ch. 53535 to 55700 on EPC mode under residual NHDP component of Bharatmala Pariyojna is a centrally-funded infrastructure project under the Ministry of Road Transport & Highways, tracked through the Investment Project Monitoring (IPM) system. Sector: Roads & Highways. State: Jammu & Kashmir. Original cost: ₹243 Cr.
- QWhat is the cost overrun for this Bihar IPM project?
- The original cost was ₹243 Cr and has been revised to ₹732 Cr — a cost overrun of +201.1%. Expenditure to date: ₹679 Cr (92.7% of revised cost). Data as of 2026-08.
- QWhich ministry is responsible for this project?
- Construction of twin tube tunnels on Jammu Kashmir Ring Road is under the Ministry of Road Transport & Highways in the Roads & Highways sector. Project code: 618549. Bihar is one of the states tracked under the central IPM dashboard for this project.
- QWhat is the IPM dashboard and what does it track?
- The Investment Project Monitoring (IPM) dashboard, maintained by DPIIT (Department for Promotion of Industry and Internal Trade), tracks centrally-funded infrastructure projects worth ₹150 Crore and above. Construction of twin tube tunnels on Jammu Kashmir Ring Road is one of several Bihar projects tracked under the Roads & Highways sector on the IPM system.