Construction of Tunnels/Viaducts at identified sliding/slip zones at Km 130.550 to Km.130.750 Km. 131.170 to Km. 131.763 Km. 132.560 to Km. 133.168 Km. 133.590 to Km. 133.743 and Km. 147.877 to Km. 148.715 of Udhampur-Ramban section of NH-44
Original Cost
₹442 Cr
Baseline estimate
Revised Cost
₹533 Cr
Latest approved cost
Expenditure
₹325 Cr
Spent to date
Utilization
60.9%
Of revised budget
Cost Status
+20.6%
+₹91 Cr increase
Remaining
₹208 Cr
Budget left
Budget Utilization
60.9%Spent
₹325 Cr
Remaining
₹208 Cr
Total
₹533 Cr
Budget Split
Cost Escalation Analysis
Original Cost
₹442 Cr
Revised Cost
₹533 Cr
Increase
+₹91 Cr
Escalation
+20.6%
Project Timeline
Project Approved
Construction / Implementation
Original End Date
04/10/2023
Revised Completion
30/06/2025
Completed
Project Details
Financial Summary
Project Intelligence
Cost has increased by ₹91 Cr (20.6%) from the original estimate of ₹442 Cr.
Expenditure stands at ₹325 Cr, which is 60.9% of the revised project cost.
Remaining budget: ₹208 Cr. Tracked under the DPIIT Investment Project Monitoring system.
Sector: Roads & Highways. Ministry: Ministry of Road Transport & Highways.
Construction of Tunnels/Viaducts at identified sliding/slip zones at Km 130.550 to Km.130.750 Km. 131.170 to Km. 131.763 Km. 132.560 to Km. 133.168 Km. 133.590 to Km. 133.743 and Km. 147.877 to Km. 148.715 of Udhampur-Ramban section of NH-44 is a centrally-funded infrastructure project under Ministry of Road Transport & Highways, in the Roads & Highways sector. The original approved cost is ₹442.00 Cr, later revised to ₹533.11 Cr.
This project is tracked under the Investment Project Monitoring (IPM) system maintained by DPIIT. Other central projects in the same sector are listed below.
Frequently Asked Questions
- QWhat is IPM project "Construction of Tunnels/Viaducts at identified sliding/slip zones at Km 130.550 "?
- Construction of Tunnels/Viaducts at identified sliding/slip zones at Km 130.550 to Km.130.750 Km. 131.170 to Km. 131.763 Km. 132.560 to Km. 133.168 Km. 133.590 to Km. 133.743 and Km. 147.877 to Km. 148.715 of Udhampur-Ramban section of NH-44 is a centrally-funded infrastructure project under the Ministry of Road Transport & Highways, tracked through the Investment Project Monitoring (IPM) system. Sector: Roads & Highways. State: Jammu & Kashmir. Original cost: ₹442 Cr.
- QWhat is the cost overrun for this Bihar IPM project?
- The original cost was ₹442 Cr and has been revised to ₹533 Cr — a cost overrun of +20.6%. Expenditure to date: ₹325 Cr (60.9% of revised cost). Data as of 2026-02.
- QWhich ministry is responsible for this project?
- Construction of Tunnels/Viaducts at identified sliding/slip is under the Ministry of Road Transport & Highways in the Roads & Highways sector. Project code: 618546. Bihar is one of the states tracked under the central IPM dashboard for this project.
- QWhat is the IPM dashboard and what does it track?
- The Investment Project Monitoring (IPM) dashboard, maintained by DPIIT (Department for Promotion of Industry and Internal Trade), tracks centrally-funded infrastructure projects worth ₹150 Crore and above. Construction of Tunnels/Viaducts at identified sliding/slip is one of several Bihar projects tracked under the Roads & Highways sector on the IPM system.