Roads & HighwaysIPM · Central Project#617950

Construction of Srinivasapura Bypass from existing Km 453.890 Design Ch. 0000 to existing Km 461.450 Design Ch 10080 on NH-69 in the State of Karnataka Under NH O in EPC mode under Annual Plan 2022-23 NH-69-KNT-2022-23-966 dated 22.11.2022

Ministry of Road Transport & HighwaysKarnataka
Revised Cost: ₹204 CrUtilization: 27.0%

Original Cost

₹204 Cr

Baseline estimate

On budget

Revised Cost

₹204 Cr

Latest approved cost

Expenditure

₹55 Cr

Spent to date

Utilization

27.0%

Of revised budget

Stable

Cost Status

On Budget

No escalation

Remaining

₹149 Cr

Budget left

Budget Utilization

27.0%
0%25%50%75%100%

Spent

₹55 Cr

Remaining

₹149 Cr

Total

₹204 Cr

Budget Split

SpentRemaining

Project Timeline

Project Approved

Construction / Implementation

Original End Date

11/01/2027

Revised Completion

11/01/2027

Completed

Project Details

Project Code617950
SectorRoads & Highways
MinistryMinistry of Road Transport & Highways
StateKarnataka
Data Month2026-08

Financial Summary

Original Cost₹204 Cr
Revised Cost₹204 Cr
Expenditure₹55 Cr
Original End Date11/01/2027
Revised Date11/01/2027

Project Intelligence

Project is within original budget of ₹204 Cr — no cost escalation recorded.

Expenditure stands at ₹55 Cr, which is 27.0% of the revised project cost.

Remaining budget: ₹149 Cr. Tracked under the DPIIT Investment Project Monitoring system.

Sector: Roads & Highways. Ministry: Ministry of Road Transport & Highways.

Construction of Srinivasapura Bypass from existing Km 453.890 Design Ch. 0000 to existing Km 461.450 Design Ch 10080 on NH-69 in the State of Karnataka Under NH O in EPC mode under Annual Plan 2022-23 NH-69-KNT-2022-23-966 dated 22.11.2022 is a centrally-funded infrastructure project under Ministry of Road Transport & Highways, in the Roads & Highways sector. The original approved cost is ₹204.00 Cr.

This project is tracked under the Investment Project Monitoring (IPM) system maintained by DPIIT. Other central projects in the same sector are listed below.

?

Frequently Asked Questions

QWhat is IPM project "Construction of Srinivasapura Bypass from existing Km 453.890 Design Ch. 0000 "?
Construction of Srinivasapura Bypass from existing Km 453.890 Design Ch. 0000 to existing Km 461.450 Design Ch 10080 on NH-69 in the State of Karnataka Under NH O in EPC mode under Annual Plan 2022-23 NH-69-KNT-2022-23-966 dated 22.11.2022 is a centrally-funded infrastructure project under the Ministry of Road Transport & Highways, tracked through the Investment Project Monitoring (IPM) system. Sector: Roads & Highways. State: Karnataka. Original cost: ₹204 Cr.
QWhat is the cost overrun for this Bihar IPM project?
The original cost of ₹204 Cr has not been significantly revised. Expenditure: ₹55 Cr (27.0% of cost). Data as of 2026-08.
QWhich ministry is responsible for this project?
Construction of Srinivasapura Bypass from existing Km 453.89 is under the Ministry of Road Transport & Highways in the Roads & Highways sector. Project code: 617950. Bihar is one of the states tracked under the central IPM dashboard for this project.
QWhat is the IPM dashboard and what does it track?
The Investment Project Monitoring (IPM) dashboard, maintained by DPIIT (Department for Promotion of Industry and Internal Trade), tracks centrally-funded infrastructure projects worth ₹150 Crore and above. Construction of Srinivasapura Bypass from existing Km 453.89 is one of several Bihar projects tracked under the Roads & Highways sector on the IPM system.