Construction of Srinivasapura Bypass from existing Km 453.890 Design Ch. 0000 to existing Km 461.450 Design Ch 10080 on NH-69 in the State of Karnataka Under NH O in EPC mode under Annual Plan 2022-23 NH-69-KNT-2022-23-966 dated 22.11.2022
Original Cost
₹204 Cr
Baseline estimate
Revised Cost
₹204 Cr
Latest approved cost
Expenditure
₹55 Cr
Spent to date
Utilization
27.0%
Of revised budget
Cost Status
On Budget
No escalation
Remaining
₹149 Cr
Budget left
Budget Utilization
27.0%Spent
₹55 Cr
Remaining
₹149 Cr
Total
₹204 Cr
Budget Split
Project Timeline
Project Approved
Construction / Implementation
Original End Date
11/01/2027
Revised Completion
11/01/2027
Completed
Project Details
Financial Summary
Project Intelligence
Project is within original budget of ₹204 Cr — no cost escalation recorded.
Expenditure stands at ₹55 Cr, which is 27.0% of the revised project cost.
Remaining budget: ₹149 Cr. Tracked under the DPIIT Investment Project Monitoring system.
Sector: Roads & Highways. Ministry: Ministry of Road Transport & Highways.
Construction of Srinivasapura Bypass from existing Km 453.890 Design Ch. 0000 to existing Km 461.450 Design Ch 10080 on NH-69 in the State of Karnataka Under NH O in EPC mode under Annual Plan 2022-23 NH-69-KNT-2022-23-966 dated 22.11.2022 is a centrally-funded infrastructure project under Ministry of Road Transport & Highways, in the Roads & Highways sector. The original approved cost is ₹204.00 Cr.
This project is tracked under the Investment Project Monitoring (IPM) system maintained by DPIIT. Other central projects in the same sector are listed below.
Frequently Asked Questions
- QWhat is IPM project "Construction of Srinivasapura Bypass from existing Km 453.890 Design Ch. 0000 "?
- Construction of Srinivasapura Bypass from existing Km 453.890 Design Ch. 0000 to existing Km 461.450 Design Ch 10080 on NH-69 in the State of Karnataka Under NH O in EPC mode under Annual Plan 2022-23 NH-69-KNT-2022-23-966 dated 22.11.2022 is a centrally-funded infrastructure project under the Ministry of Road Transport & Highways, tracked through the Investment Project Monitoring (IPM) system. Sector: Roads & Highways. State: Karnataka. Original cost: ₹204 Cr.
- QWhat is the cost overrun for this Bihar IPM project?
- The original cost of ₹204 Cr has not been significantly revised. Expenditure: ₹55 Cr (27.0% of cost). Data as of 2026-08.
- QWhich ministry is responsible for this project?
- Construction of Srinivasapura Bypass from existing Km 453.89 is under the Ministry of Road Transport & Highways in the Roads & Highways sector. Project code: 617950. Bihar is one of the states tracked under the central IPM dashboard for this project.
- QWhat is the IPM dashboard and what does it track?
- The Investment Project Monitoring (IPM) dashboard, maintained by DPIIT (Department for Promotion of Industry and Internal Trade), tracks centrally-funded infrastructure projects worth ₹150 Crore and above. Construction of Srinivasapura Bypass from existing Km 453.89 is one of several Bihar projects tracked under the Roads & Highways sector on the IPM system.