Construction of Rudraprayag tunnel of length 900.30 MTR including approaches and one major bridge on river Alaknanda connecting NH-107/old-109 to NH-07old-58 on EPC mode in the state of Uttarakhand.
Original Cost
₹252 Cr
Baseline estimate
Revised Cost
₹252 Cr
Latest approved cost
Expenditure
₹158 Cr
Spent to date
Utilization
62.9%
Of revised budget
Cost Status
On Budget
No escalation
Remaining
₹94 Cr
Budget left
Budget Utilization
62.9%Spent
₹158 Cr
Remaining
₹94 Cr
Total
₹252 Cr
Budget Split
Project Timeline
Project Approved
Construction / Implementation
Original End Date
25/07/2025
Revised Completion
30/09/2026
Completed
Project Details
Financial Summary
Project Intelligence
Project is within original budget of ₹252 Cr — no cost escalation recorded.
Expenditure stands at ₹158 Cr, which is 62.9% of the revised project cost.
Remaining budget: ₹94 Cr. Tracked under the DPIIT Investment Project Monitoring system.
Sector: Roads & Highways. Ministry: Ministry of Road Transport & Highways.
Construction of Rudraprayag tunnel of length 900.30 MTR including approaches and one major bridge on river Alaknanda connecting NH-107/old-109 to NH-07old-58 on EPC mode in the state of Uttarakhand. is a centrally-funded infrastructure project under Ministry of Road Transport & Highways, in the Roads & Highways sector. The original approved cost is ₹252.00 Cr.
This project is tracked under the Investment Project Monitoring (IPM) system maintained by DPIIT. Other central projects in the same sector are listed below.
Frequently Asked Questions
- QWhat is IPM project "Construction of Rudraprayag tunnel of length 900.30 MTR including approaches and"?
- Construction of Rudraprayag tunnel of length 900.30 MTR including approaches and one major bridge on river Alaknanda connecting NH-107/old-109 to NH-07old-58 on EPC mode in the state of Uttarakhand. is a centrally-funded infrastructure project under the Ministry of Road Transport & Highways, tracked through the Investment Project Monitoring (IPM) system. Sector: Roads & Highways. State: Uttarakhand. Original cost: ₹252 Cr.
- QWhat is the cost overrun for this Bihar IPM project?
- The original cost of ₹252 Cr has not been significantly revised. Expenditure: ₹158 Cr (62.9% of cost). Data as of 2026-08.
- QWhich ministry is responsible for this project?
- Construction of Rudraprayag tunnel of length 900.30 MTR incl is under the Ministry of Road Transport & Highways in the Roads & Highways sector. Project code: 617967. Bihar is one of the states tracked under the central IPM dashboard for this project.
- QWhat is the IPM dashboard and what does it track?
- The Investment Project Monitoring (IPM) dashboard, maintained by DPIIT (Department for Promotion of Industry and Internal Trade), tracks centrally-funded infrastructure projects worth ₹150 Crore and above. Construction of Rudraprayag tunnel of length 900.30 MTR incl is one of several Bihar projects tracked under the Roads & Highways sector on the IPM system.