Construction of road from Bomdilla9th Mile- Nafra Lada section of Frontier Highway NH-913 Package 1 9th mile-Nafra 19.554 to 70.00 50.446
Original Cost
₹1273 Cr
Baseline estimate
Revised Cost
₹1273 Cr
Latest approved cost
Expenditure
₹152 Cr
Spent to date
Utilization
11.9%
Of revised budget
Cost Status
On Budget
No escalation
Remaining
₹1121 Cr
Budget left
Budget Utilization
11.9%Spent
₹152 Cr
Remaining
₹1121 Cr
Total
₹1273 Cr
Budget Split
Project Timeline
Project Approved
Construction / Implementation
Original End Date
17/07/2029
Revised Completion
Completed
Project Details
Financial Summary
Project Intelligence
Project is within original budget of ₹1273 Cr — no cost escalation recorded.
Expenditure stands at ₹152 Cr, which is 11.9% of the revised project cost.
Remaining budget: ₹1121 Cr. Tracked under the DPIIT Investment Project Monitoring system.
Sector: Roads & Highways. Ministry: Ministry of Road Transport & Highways.
Construction of road from Bomdilla9th Mile- Nafra Lada section of Frontier Highway NH-913 Package 1 9th mile-Nafra 19.554 to 70.00 50.446 is a centrally-funded infrastructure project under Ministry of Road Transport & Highways, in the Roads & Highways sector. The original approved cost is ₹1273.00 Cr.
This project is tracked under the Investment Project Monitoring (IPM) system maintained by DPIIT. Other central projects in the same sector are listed below.
Frequently Asked Questions
- QWhat is IPM project "Construction of road from Bomdilla9th Mile- Nafra Lada section of Frontier Highw"?
- Construction of road from Bomdilla9th Mile- Nafra Lada section of Frontier Highway NH-913 Package 1 9th mile-Nafra 19.554 to 70.00 50.446 is a centrally-funded infrastructure project under the Ministry of Road Transport & Highways, tracked through the Investment Project Monitoring (IPM) system. Sector: Roads & Highways. State: Arunachal Pradesh. Original cost: ₹1273 Cr.
- QWhat is the cost overrun for this Bihar IPM project?
- The original cost of ₹1273 Cr has not been significantly revised. Expenditure: ₹152 Cr (11.9% of cost). Data as of 2026-08.
- QWhich ministry is responsible for this project?
- Construction of road from Bomdilla9th Mile- Nafra Lada secti is under the Ministry of Road Transport & Highways in the Roads & Highways sector. Project code: 198592. Bihar is one of the states tracked under the central IPM dashboard for this project.
- QWhat is the IPM dashboard and what does it track?
- The Investment Project Monitoring (IPM) dashboard, maintained by DPIIT (Department for Promotion of Industry and Internal Trade), tracks centrally-funded infrastructure projects worth ₹150 Crore and above. Construction of road from Bomdilla9th Mile- Nafra Lada secti is one of several Bihar projects tracked under the Roads & Highways sector on the IPM system.