Original Cost
₹225 Cr
Baseline estimate
Revised Cost
₹225 Cr
Latest approved cost
Expenditure
₹134 Cr
Spent to date
Utilization
59.6%
Of revised budget
Cost Status
On Budget
No escalation
Remaining
₹91 Cr
Budget left
Budget Utilization
59.6%Spent
₹134 Cr
Remaining
₹91 Cr
Total
₹225 Cr
Budget Split
Project Timeline
Project Approved
Construction / Implementation
Original End Date
30/06/2025
Revised Completion
30/09/2026
Completed
Project Details
Financial Summary
Project Intelligence
Project is within original budget of ₹225 Cr — no cost escalation recorded.
Expenditure stands at ₹134 Cr, which is 59.6% of the revised project cost.
Remaining budget: ₹91 Cr. Tracked under the DPIIT Investment Project Monitoring system.
Sector: Roads & Highways. Ministry: Ministry of Road Transport & Highways.
Construction of Pratapgarh Bypass Extension connecting NH-31 to NH-330 on EPC mode in the State of Uttar Pradesh. is a centrally-funded infrastructure project under Ministry of Road Transport & Highways, in the Roads & Highways sector. The original approved cost is ₹225.00 Cr.
This project is tracked under the Investment Project Monitoring (IPM) system maintained by DPIIT. Other central projects in the same sector are listed below.
Frequently Asked Questions
- QWhat is IPM project "Construction of Pratapgarh Bypass Extension connecting NH-31 to NH-330 on EPC mo"?
- Construction of Pratapgarh Bypass Extension connecting NH-31 to NH-330 on EPC mode in the State of Uttar Pradesh. is a centrally-funded infrastructure project under the Ministry of Road Transport & Highways, tracked through the Investment Project Monitoring (IPM) system. Sector: Roads & Highways. State: Uttar Pradesh. Original cost: ₹225 Cr.
- QWhat is the cost overrun for this Bihar IPM project?
- The original cost of ₹225 Cr has not been significantly revised. Expenditure: ₹134 Cr (59.6% of cost). Data as of 2026-08.
- QWhich ministry is responsible for this project?
- Construction of Pratapgarh Bypass Extension connecting NH-31 is under the Ministry of Road Transport & Highways in the Roads & Highways sector. Project code: 618055. Bihar is one of the states tracked under the central IPM dashboard for this project.
- QWhat is the IPM dashboard and what does it track?
- The Investment Project Monitoring (IPM) dashboard, maintained by DPIIT (Department for Promotion of Industry and Internal Trade), tracks centrally-funded infrastructure projects worth ₹150 Crore and above. Construction of Pratapgarh Bypass Extension connecting NH-31 is one of several Bihar projects tracked under the Roads & Highways sector on the IPM system.