Construction of of 2 -Lane with paved shoulders road from Tamenglong-Tousem-Lisang-Mahur Road NH-137 starting near Dialong Village from km 10.000 at Dialong to km 31.430 near Old Tamenglong , near Barak River on EPC Mode Package-2
Original Cost
₹484 Cr
Baseline estimate
Revised Cost
₹484 Cr
Latest approved cost
Expenditure
₹376 Cr
Spent to date
Utilization
77.7%
Of revised budget
Cost Status
On Budget
No escalation
Remaining
₹108 Cr
Budget left
Budget Utilization
77.7%Spent
₹376 Cr
Remaining
₹108 Cr
Total
₹484 Cr
Budget Split
Project Timeline
Project Approved
Construction / Implementation
Original End Date
16/03/2023
Revised Completion
31/03/2026
Completed
Project Details
Financial Summary
Project Intelligence
Project is within original budget of ₹484 Cr — no cost escalation recorded.
Expenditure stands at ₹376 Cr, which is 77.7% of the revised project cost.
Remaining budget: ₹108 Cr. Tracked under the DPIIT Investment Project Monitoring system.
Sector: Roads & Highways. Ministry: Ministry of Road Transport & Highways.
Construction of of 2 -Lane with paved shoulders road from Tamenglong-Tousem-Lisang-Mahur Road NH-137 starting near Dialong Village from km 10.000 at Dialong to km 31.430 near Old Tamenglong , near Barak River on EPC Mode Package-2 is a centrally-funded infrastructure project under Ministry of Road Transport & Highways, in the Roads & Highways sector. The original approved cost is ₹484.00 Cr.
This project is tracked under the Investment Project Monitoring (IPM) system maintained by DPIIT. Other central projects in the same sector are listed below.
Frequently Asked Questions
- QWhat is IPM project "Construction of of 2 -Lane with paved shoulders road from Tamenglong-Tousem-Lisa"?
- Construction of of 2 -Lane with paved shoulders road from Tamenglong-Tousem-Lisang-Mahur Road NH-137 starting near Dialong Village from km 10.000 at Dialong to km 31.430 near Old Tamenglong , near Barak River on EPC Mode Package-2 is a centrally-funded infrastructure project under the Ministry of Road Transport & Highways, tracked through the Investment Project Monitoring (IPM) system. Sector: Roads & Highways. State: Manipur. Original cost: ₹484 Cr.
- QWhat is the cost overrun for this Bihar IPM project?
- The original cost of ₹484 Cr has not been significantly revised. Expenditure: ₹376 Cr (77.7% of cost). Data as of 2026-08.
- QWhich ministry is responsible for this project?
- Construction of of 2 -Lane with paved shoulders road from Ta is under the Ministry of Road Transport & Highways in the Roads & Highways sector. Project code: 618355. Bihar is one of the states tracked under the central IPM dashboard for this project.
- QWhat is the IPM dashboard and what does it track?
- The Investment Project Monitoring (IPM) dashboard, maintained by DPIIT (Department for Promotion of Industry and Internal Trade), tracks centrally-funded infrastructure projects worth ₹150 Crore and above. Construction of of 2 -Lane with paved shoulders road from Ta is one of several Bihar projects tracked under the Roads & Highways sector on the IPM system.