Construction of New Double Tier 4L Elevated Corridor from Chennai Port to Maduravoyal in Chennai District from km -0.342 to Km 20.593 and Package IV from Km 14.185 to Km 20.593
Original Cost
₹1205 Cr
Baseline estimate
Revised Cost
₹1210 Cr
Latest approved cost
Expenditure
₹97 Cr
Spent to date
Utilization
8.0%
Of revised budget
Cost Status
+0.4%
+₹5 Cr increase
Remaining
₹1113 Cr
Budget left
Budget Utilization
8.0%Spent
₹97 Cr
Remaining
₹1113 Cr
Total
₹1210 Cr
Budget Split
Cost Escalation Analysis
Original Cost
₹1205 Cr
Revised Cost
₹1210 Cr
Increase
+₹5 Cr
Escalation
+0.4%
Project Timeline
Project Approved
Construction / Implementation
Original End Date
20/05/2026
Revised Completion
31/03/2029
Completed
Project Details
Financial Summary
Project Intelligence
Cost has increased by ₹5 Cr (0.4%) from the original estimate of ₹1205 Cr.
Expenditure stands at ₹97 Cr, which is 8.0% of the revised project cost.
Remaining budget: ₹1113 Cr. Tracked under the DPIIT Investment Project Monitoring system.
Sector: Roads & Highways. Ministry: Ministry of Road Transport & Highways.
Construction of New Double Tier 4L Elevated Corridor from Chennai Port to Maduravoyal in Chennai District from km -0.342 to Km 20.593 and Package IV from Km 14.185 to Km 20.593 is a centrally-funded infrastructure project under Ministry of Road Transport & Highways, in the Roads & Highways sector. The original approved cost is ₹1205.00 Cr, later revised to ₹1210.21 Cr.
This project is tracked under the Investment Project Monitoring (IPM) system maintained by DPIIT. Other central projects in the same sector are listed below.
Frequently Asked Questions
- QWhat is IPM project "Construction of New Double Tier 4L Elevated Corridor from Chennai Port to Madura"?
- Construction of New Double Tier 4L Elevated Corridor from Chennai Port to Maduravoyal in Chennai District from km -0.342 to Km 20.593 and Package IV from Km 14.185 to Km 20.593 is a centrally-funded infrastructure project under the Ministry of Road Transport & Highways, tracked through the Investment Project Monitoring (IPM) system. Sector: Roads & Highways. State: Tamil Nadu. Original cost: ₹1205 Cr.
- QWhat is the cost overrun for this Bihar IPM project?
- The original cost was ₹1205 Cr and has been revised to ₹1210 Cr — a cost overrun of +0.4%. Expenditure to date: ₹97 Cr (8.0% of revised cost). Data as of 2026-08.
- QWhich ministry is responsible for this project?
- Construction of New Double Tier 4L Elevated Corridor from Ch is under the Ministry of Road Transport & Highways in the Roads & Highways sector. Project code: 619045. Bihar is one of the states tracked under the central IPM dashboard for this project.
- QWhat is the IPM dashboard and what does it track?
- The Investment Project Monitoring (IPM) dashboard, maintained by DPIIT (Department for Promotion of Industry and Internal Trade), tracks centrally-funded infrastructure projects worth ₹150 Crore and above. Construction of New Double Tier 4L Elevated Corridor from Ch is one of several Bihar projects tracked under the Roads & Highways sector on the IPM system.