Roads & HighwaysIPM · Central Project#618156

Construction of Morena bypass, Ambah bypass & Porsa bypass Totat length 27.16 km Section of NH-552 Ext. to TWo lane with paved shoulder configuration in the state of Madhya Pradesh on EPC mode

Ministry of Road Transport & HighwaysMadhya Pradesh
Revised Cost: ₹493 CrUtilization: 63.7%

Original Cost

₹493 Cr

Baseline estimate

On budget

Revised Cost

₹493 Cr

Latest approved cost

Expenditure

₹314 Cr

Spent to date

Utilization

63.7%

Of revised budget

Stable

Cost Status

On Budget

No escalation

Remaining

₹179 Cr

Budget left

Budget Utilization

63.7%
0%25%50%75%100%

Spent

₹314 Cr

Remaining

₹179 Cr

Total

₹493 Cr

Budget Split

SpentRemaining

Project Timeline

Project Approved

Construction / Implementation

Original End Date

02/10/2026

Revised Completion

02/10/2026

Completed

Project Details

Project Code618156
SectorRoads & Highways
MinistryMinistry of Road Transport & Highways
StateMadhya Pradesh
Data Month2026-08

Financial Summary

Original Cost₹493 Cr
Revised Cost₹493 Cr
Expenditure₹314 Cr
Original End Date02/10/2026
Revised Date02/10/2026

Project Intelligence

Project is within original budget of ₹493 Cr — no cost escalation recorded.

Expenditure stands at ₹314 Cr, which is 63.7% of the revised project cost.

Remaining budget: ₹179 Cr. Tracked under the DPIIT Investment Project Monitoring system.

Sector: Roads & Highways. Ministry: Ministry of Road Transport & Highways.

Construction of Morena bypass, Ambah bypass & Porsa bypass Totat length 27.16 km Section of NH-552 Ext. to TWo lane with paved shoulder configuration in the state of Madhya Pradesh on EPC mode is a centrally-funded infrastructure project under Ministry of Road Transport & Highways, in the Roads & Highways sector. The original approved cost is ₹493.00 Cr.

This project is tracked under the Investment Project Monitoring (IPM) system maintained by DPIIT. Other central projects in the same sector are listed below.

?

Frequently Asked Questions

QWhat is IPM project "Construction of Morena bypass, Ambah bypass & Porsa bypass Totat length 27.16 km"?
Construction of Morena bypass, Ambah bypass & Porsa bypass Totat length 27.16 km Section of NH-552 Ext. to TWo lane with paved shoulder configuration in the state of Madhya Pradesh on EPC mode is a centrally-funded infrastructure project under the Ministry of Road Transport & Highways, tracked through the Investment Project Monitoring (IPM) system. Sector: Roads & Highways. State: Madhya Pradesh. Original cost: ₹493 Cr.
QWhat is the cost overrun for this Bihar IPM project?
The original cost of ₹493 Cr has not been significantly revised. Expenditure: ₹314 Cr (63.7% of cost). Data as of 2026-08.
QWhich ministry is responsible for this project?
Construction of Morena bypass, Ambah bypass & Porsa bypass T is under the Ministry of Road Transport & Highways in the Roads & Highways sector. Project code: 618156. Bihar is one of the states tracked under the central IPM dashboard for this project.
QWhat is the IPM dashboard and what does it track?
The Investment Project Monitoring (IPM) dashboard, maintained by DPIIT (Department for Promotion of Industry and Internal Trade), tracks centrally-funded infrastructure projects worth ₹150 Crore and above. Construction of Morena bypass, Ambah bypass & Porsa bypass T is one of several Bihar projects tracked under the Roads & Highways sector on the IPM system.