Roads & HighwaysIPM · Central Project +3.0% overrun#618253

Construction of missing link from Birhu to Lathiani from Km 35/550 Design chainage Km 0.000 to Km 42/800 Design Chainage Km 8.153on NH-503A including Lathiani Bridge on back water of Govindsagar and its approaches in Himachal Pradesh.

Ministry of Road Transport & HighwaysHimachal Pradesh
Revised Cost: ₹897 CrUtilization: 11.2%Overrun: +₹26 Cr

Original Cost

₹871 Cr

Baseline estimate

+3% overrun

Revised Cost

₹897 Cr

Latest approved cost

Expenditure

₹101 Cr

Spent to date

Utilization

11.2%

Of revised budget

Escalated

Cost Status

+3.0%

+₹26 Cr increase

Remaining

₹796 Cr

Budget left

Budget Utilization

11.2%
0%25%50%75%100%

Spent

₹101 Cr

Remaining

₹796 Cr

Total

₹897 Cr

Budget Split

SpentRemaining

Cost Escalation Analysis

Original Cost

₹871 Cr

Revised Cost

₹897 Cr

Increase

+₹26 Cr

Escalation

+3.0%

Project Timeline

Project Approved

Construction / Implementation

Original End Date

29/03/2029

Revised Completion

29/03/2029

Completed

Project Details

Project Code618253
SectorRoads & Highways
MinistryMinistry of Road Transport & Highways
StateHimachal Pradesh
Data Month2026-08

Financial Summary

Original Cost₹871 Cr
Revised Cost₹897 Cr
Expenditure₹101 Cr
Original End Date29/03/2029
Revised Date29/03/2029

Project Intelligence

Cost has increased by ₹26 Cr (3.0%) from the original estimate of ₹871 Cr.

Expenditure stands at ₹101 Cr, which is 11.2% of the revised project cost.

Remaining budget: ₹796 Cr. Tracked under the DPIIT Investment Project Monitoring system.

Sector: Roads & Highways. Ministry: Ministry of Road Transport & Highways.

Construction of missing link from Birhu to Lathiani from Km 35/550 Design chainage Km 0.000 to Km 42/800 Design Chainage Km 8.153on NH-503A including Lathiani Bridge on back water of Govindsagar and its approaches in Himachal Pradesh. is a centrally-funded infrastructure project under Ministry of Road Transport & Highways, in the Roads & Highways sector. The original approved cost is ₹871.00 Cr, later revised to ₹896.86 Cr.

This project is tracked under the Investment Project Monitoring (IPM) system maintained by DPIIT. Other central projects in the same sector are listed below.

?

Frequently Asked Questions

QWhat is IPM project "Construction of missing link from Birhu to Lathiani from Km 35/550 Design chaina"?
Construction of missing link from Birhu to Lathiani from Km 35/550 Design chainage Km 0.000 to Km 42/800 Design Chainage Km 8.153on NH-503A including Lathiani Bridge on back water of Govindsagar and its approaches in Himachal Pradesh. is a centrally-funded infrastructure project under the Ministry of Road Transport & Highways, tracked through the Investment Project Monitoring (IPM) system. Sector: Roads & Highways. State: Himachal Pradesh. Original cost: ₹871 Cr.
QWhat is the cost overrun for this Bihar IPM project?
The original cost was ₹871 Cr and has been revised to ₹897 Cr — a cost overrun of +3%. Expenditure to date: ₹101 Cr (11.2% of revised cost). Data as of 2026-08.
QWhich ministry is responsible for this project?
Construction of missing link from Birhu to Lathiani from Km is under the Ministry of Road Transport & Highways in the Roads & Highways sector. Project code: 618253. Bihar is one of the states tracked under the central IPM dashboard for this project.
QWhat is the IPM dashboard and what does it track?
The Investment Project Monitoring (IPM) dashboard, maintained by DPIIT (Department for Promotion of Industry and Internal Trade), tracks centrally-funded infrastructure projects worth ₹150 Crore and above. Construction of missing link from Birhu to Lathiani from Km is one of several Bihar projects tracked under the Roads & Highways sector on the IPM system.