Roads & HighwaysIPM · Central Project#618045

Construction of Mihona bypass, Lahar bypass, Daboh bypass & Bhander Bypass total length 20.60 km to 2-lane with paved shoulder from on Mihona-Bhander-MP/UP border section of NH 552E in the State of Madhya Pradesh on EPC mode

Ministry of Road Transport & HighwaysMadhya Pradesh
Revised Cost: ₹179 CrUtilization: 40.1%

Original Cost

₹179 Cr

Baseline estimate

On budget

Revised Cost

₹179 Cr

Latest approved cost

Expenditure

₹72 Cr

Spent to date

Utilization

40.1%

Of revised budget

Stable

Cost Status

On Budget

No escalation

Remaining

₹107 Cr

Budget left

Budget Utilization

40.1%
0%25%50%75%100%

Spent

₹72 Cr

Remaining

₹107 Cr

Total

₹179 Cr

Budget Split

SpentRemaining

Project Timeline

Project Approved

Construction / Implementation

Original End Date

19/12/2024

Revised Completion

Completed

Project Details

Project Code618045
SectorRoads & Highways
MinistryMinistry of Road Transport & Highways
StateMadhya Pradesh
Data Month2026-05

Financial Summary

Original Cost₹179 Cr
Revised Cost₹179 Cr
Expenditure₹72 Cr
Original End Date19/12/2024
Revised DateN/A

Project Intelligence

Project is within original budget of ₹179 Cr — no cost escalation recorded.

Expenditure stands at ₹72 Cr, which is 40.1% of the revised project cost.

Remaining budget: ₹107 Cr. Tracked under the DPIIT Investment Project Monitoring system.

Sector: Roads & Highways. Ministry: Ministry of Road Transport & Highways.

Construction of Mihona bypass, Lahar bypass, Daboh bypass & Bhander Bypass total length 20.60 km to 2-lane with paved shoulder from on Mihona-Bhander-MP/UP border section of NH 552E in the State of Madhya Pradesh on EPC mode is a centrally-funded infrastructure project under Ministry of Road Transport & Highways, in the Roads & Highways sector. The original approved cost is ₹179.00 Cr.

This project is tracked under the Investment Project Monitoring (IPM) system maintained by DPIIT. Other central projects in the same sector are listed below.

?

Frequently Asked Questions

QWhat is IPM project "Construction of Mihona bypass, Lahar bypass, Daboh bypass & Bhander Bypass total"?
Construction of Mihona bypass, Lahar bypass, Daboh bypass & Bhander Bypass total length 20.60 km to 2-lane with paved shoulder from on Mihona-Bhander-MP/UP border section of NH 552E in the State of Madhya Pradesh on EPC mode is a centrally-funded infrastructure project under the Ministry of Road Transport & Highways, tracked through the Investment Project Monitoring (IPM) system. Sector: Roads & Highways. State: Madhya Pradesh. Original cost: ₹179 Cr.
QWhat is the cost overrun for this Bihar IPM project?
The original cost of ₹179 Cr has not been significantly revised. Expenditure: ₹72 Cr (40.1% of cost). Data as of 2026-05.
QWhich ministry is responsible for this project?
Construction of Mihona bypass, Lahar bypass, Daboh bypass & is under the Ministry of Road Transport & Highways in the Roads & Highways sector. Project code: 618045. Bihar is one of the states tracked under the central IPM dashboard for this project.
QWhat is the IPM dashboard and what does it track?
The Investment Project Monitoring (IPM) dashboard, maintained by DPIIT (Department for Promotion of Industry and Internal Trade), tracks centrally-funded infrastructure projects worth ₹150 Crore and above. Construction of Mihona bypass, Lahar bypass, Daboh bypass & is one of several Bihar projects tracked under the Roads & Highways sector on the IPM system.