Construction of Mihona bypass, Lahar bypass, Daboh bypass & Bhander Bypass total length 20.60 km to 2-lane with paved shoulder from on Mihona-Bhander-MP/UP border section of NH 552E in the State of Madhya Pradesh on EPC mode
Original Cost
₹179 Cr
Baseline estimate
Revised Cost
₹179 Cr
Latest approved cost
Expenditure
₹72 Cr
Spent to date
Utilization
40.1%
Of revised budget
Cost Status
On Budget
No escalation
Remaining
₹107 Cr
Budget left
Budget Utilization
40.1%Spent
₹72 Cr
Remaining
₹107 Cr
Total
₹179 Cr
Budget Split
Project Timeline
Project Approved
Construction / Implementation
Original End Date
19/12/2024
Revised Completion
Completed
Project Details
Financial Summary
Project Intelligence
Project is within original budget of ₹179 Cr — no cost escalation recorded.
Expenditure stands at ₹72 Cr, which is 40.1% of the revised project cost.
Remaining budget: ₹107 Cr. Tracked under the DPIIT Investment Project Monitoring system.
Sector: Roads & Highways. Ministry: Ministry of Road Transport & Highways.
Construction of Mihona bypass, Lahar bypass, Daboh bypass & Bhander Bypass total length 20.60 km to 2-lane with paved shoulder from on Mihona-Bhander-MP/UP border section of NH 552E in the State of Madhya Pradesh on EPC mode is a centrally-funded infrastructure project under Ministry of Road Transport & Highways, in the Roads & Highways sector. The original approved cost is ₹179.00 Cr.
This project is tracked under the Investment Project Monitoring (IPM) system maintained by DPIIT. Other central projects in the same sector are listed below.
Frequently Asked Questions
- QWhat is IPM project "Construction of Mihona bypass, Lahar bypass, Daboh bypass & Bhander Bypass total"?
- Construction of Mihona bypass, Lahar bypass, Daboh bypass & Bhander Bypass total length 20.60 km to 2-lane with paved shoulder from on Mihona-Bhander-MP/UP border section of NH 552E in the State of Madhya Pradesh on EPC mode is a centrally-funded infrastructure project under the Ministry of Road Transport & Highways, tracked through the Investment Project Monitoring (IPM) system. Sector: Roads & Highways. State: Madhya Pradesh. Original cost: ₹179 Cr.
- QWhat is the cost overrun for this Bihar IPM project?
- The original cost of ₹179 Cr has not been significantly revised. Expenditure: ₹72 Cr (40.1% of cost). Data as of 2026-05.
- QWhich ministry is responsible for this project?
- Construction of Mihona bypass, Lahar bypass, Daboh bypass & is under the Ministry of Road Transport & Highways in the Roads & Highways sector. Project code: 618045. Bihar is one of the states tracked under the central IPM dashboard for this project.
- QWhat is the IPM dashboard and what does it track?
- The Investment Project Monitoring (IPM) dashboard, maintained by DPIIT (Department for Promotion of Industry and Internal Trade), tracks centrally-funded infrastructure projects worth ₹150 Crore and above. Construction of Mihona bypass, Lahar bypass, Daboh bypass & is one of several Bihar projects tracked under the Roads & Highways sector on the IPM system.