Construction of Intermediate Lane with Hard Shoulder of Hunli to Hayuliang Package-III from design Km 60.000 to Km 121.500 Design Length 61.500 km, Greenfield Section of Frontier Highway NH-913 in the State of Arunachal Pradesh on EPC Mode Pkg-3
Original Cost
₹1419 Cr
Baseline estimate
Revised Cost
₹1419 Cr
Latest approved cost
Expenditure
₹93 Cr
Spent to date
Utilization
6.6%
Of revised budget
Cost Status
On Budget
No escalation
Remaining
₹1326 Cr
Budget left
Budget Utilization
6.6%Spent
₹93 Cr
Remaining
₹1326 Cr
Total
₹1419 Cr
Budget Split
Project Timeline
Project Approved
Construction / Implementation
Original End Date
17/07/2028
Revised Completion
17/07/2028
Completed
Project Details
Financial Summary
Project Intelligence
Project is within original budget of ₹1419 Cr — no cost escalation recorded.
Expenditure stands at ₹93 Cr, which is 6.6% of the revised project cost.
Remaining budget: ₹1326 Cr. Tracked under the DPIIT Investment Project Monitoring system.
Sector: Roads & Highways. Ministry: Ministry of Road Transport & Highways.
Construction of Intermediate Lane with Hard Shoulder of Hunli to Hayuliang Package-III from design Km 60.000 to Km 121.500 Design Length 61.500 km, Greenfield Section of Frontier Highway NH-913 in the State of Arunachal Pradesh on EPC Mode Pkg-3 is a centrally-funded infrastructure project under Ministry of Road Transport & Highways, in the Roads & Highways sector. The original approved cost is ₹1419.00 Cr.
This project is tracked under the Investment Project Monitoring (IPM) system maintained by DPIIT. Other central projects in the same sector are listed below.
Frequently Asked Questions
- QWhat is IPM project "Construction of Intermediate Lane with Hard Shoulder of Hunli to Hayuliang Packa"?
- Construction of Intermediate Lane with Hard Shoulder of Hunli to Hayuliang Package-III from design Km 60.000 to Km 121.500 Design Length 61.500 km, Greenfield Section of Frontier Highway NH-913 in the State of Arunachal Pradesh on EPC Mode Pkg-3 is a centrally-funded infrastructure project under the Ministry of Road Transport & Highways, tracked through the Investment Project Monitoring (IPM) system. Sector: Roads & Highways. State: Arunachal Pradesh. Original cost: ₹1419 Cr.
- QWhat is the cost overrun for this Bihar IPM project?
- The original cost of ₹1419 Cr has not been significantly revised. Expenditure: ₹93 Cr (6.6% of cost). Data as of 2026-08.
- QWhich ministry is responsible for this project?
- Construction of Intermediate Lane with Hard Shoulder of Hunl is under the Ministry of Road Transport & Highways in the Roads & Highways sector. Project code: 618401. Bihar is one of the states tracked under the central IPM dashboard for this project.
- QWhat is the IPM dashboard and what does it track?
- The Investment Project Monitoring (IPM) dashboard, maintained by DPIIT (Department for Promotion of Industry and Internal Trade), tracks centrally-funded infrastructure projects worth ₹150 Crore and above. Construction of Intermediate Lane with Hard Shoulder of Hunl is one of several Bihar projects tracked under the Roads & Highways sector on the IPM system.