Roads & HighwaysIPM · Central Project#618405

Construction of Intermediate Lane of Pango to Jorging Road from 0000 to Design Km Design Km 40000 Design Length 40.00 Km, Pkg-l, Greenfield Alignment in the State of Arunachal Pradesh on EPC mode Pkg-1

Ministry of Road Transport & HighwaysArunachal Pradesh
Revised Cost: ₹898 CrUtilization: 28.9%

Original Cost

₹898 Cr

Baseline estimate

On budget

Revised Cost

₹898 Cr

Latest approved cost

Expenditure

₹260 Cr

Spent to date

Utilization

28.9%

Of revised budget

Stable

Cost Status

On Budget

No escalation

Remaining

₹638 Cr

Budget left

Budget Utilization

28.9%
0%25%50%75%100%

Spent

₹260 Cr

Remaining

₹638 Cr

Total

₹898 Cr

Budget Split

SpentRemaining

Project Timeline

Project Approved

Construction / Implementation

Original End Date

16/07/2027

Revised Completion

16/07/2027

Completed

Project Details

Project Code618405
SectorRoads & Highways
MinistryMinistry of Road Transport & Highways
StateArunachal Pradesh
Data Month2026-08

Financial Summary

Original Cost₹898 Cr
Revised Cost₹898 Cr
Expenditure₹260 Cr
Original End Date16/07/2027
Revised Date16/07/2027

Project Intelligence

Project is within original budget of ₹898 Cr — no cost escalation recorded.

Expenditure stands at ₹260 Cr, which is 28.9% of the revised project cost.

Remaining budget: ₹638 Cr. Tracked under the DPIIT Investment Project Monitoring system.

Sector: Roads & Highways. Ministry: Ministry of Road Transport & Highways.

Construction of Intermediate Lane of Pango to Jorging Road from 0000 to Design Km Design Km 40000 Design Length 40.00 Km, Pkg-l, Greenfield Alignment in the State of Arunachal Pradesh on EPC mode Pkg-1 is a centrally-funded infrastructure project under Ministry of Road Transport & Highways, in the Roads & Highways sector. The original approved cost is ₹898.00 Cr.

This project is tracked under the Investment Project Monitoring (IPM) system maintained by DPIIT. Other central projects in the same sector are listed below.

?

Frequently Asked Questions

QWhat is IPM project "Construction of Intermediate Lane of Pango to Jorging Road from 0000 to Design K"?
Construction of Intermediate Lane of Pango to Jorging Road from 0000 to Design Km Design Km 40000 Design Length 40.00 Km, Pkg-l, Greenfield Alignment in the State of Arunachal Pradesh on EPC mode Pkg-1 is a centrally-funded infrastructure project under the Ministry of Road Transport & Highways, tracked through the Investment Project Monitoring (IPM) system. Sector: Roads & Highways. State: Arunachal Pradesh. Original cost: ₹898 Cr.
QWhat is the cost overrun for this Bihar IPM project?
The original cost of ₹898 Cr has not been significantly revised. Expenditure: ₹260 Cr (28.9% of cost). Data as of 2026-08.
QWhich ministry is responsible for this project?
Construction of Intermediate Lane of Pango to Jorging Road f is under the Ministry of Road Transport & Highways in the Roads & Highways sector. Project code: 618405. Bihar is one of the states tracked under the central IPM dashboard for this project.
QWhat is the IPM dashboard and what does it track?
The Investment Project Monitoring (IPM) dashboard, maintained by DPIIT (Department for Promotion of Industry and Internal Trade), tracks centrally-funded infrastructure projects worth ₹150 Crore and above. Construction of Intermediate Lane of Pango to Jorging Road f is one of several Bihar projects tracked under the Roads & Highways sector on the IPM system.