Construction of i Connecting Road from Z-Morh Tunnel to Zojila Tunnel Road Length 18.475km and ii 14.150 Km long 2-L Bi-directional single tube Zoji-la Tunnel across Zojila Pass on Sonamarg - Kargil section from Km 82 to Km 118 of NH-01 under PMDP
Original Cost
₹6809 Cr
Baseline estimate
Revised Cost
₹6809 Cr
Latest approved cost
Expenditure
₹3583 Cr
Spent to date
Utilization
52.6%
Of revised budget
Cost Status
On Budget
No escalation
Remaining
₹3226 Cr
Budget left
Budget Utilization
52.6%Spent
₹3583 Cr
Remaining
₹3226 Cr
Total
₹6809 Cr
Budget Split
Project Timeline
Project Approved
Construction / Implementation
Original End Date
30/09/2026
Revised Completion
28/02/2028
Completed
Project Details
Financial Summary
Project Intelligence
Project is within original budget of ₹6809 Cr — no cost escalation recorded.
Expenditure stands at ₹3583 Cr, which is 52.6% of the revised project cost.
Remaining budget: ₹3226 Cr. Tracked under the DPIIT Investment Project Monitoring system.
Sector: Roads & Highways. Ministry: Ministry of Road Transport & Highways.
Construction of i Connecting Road from Z-Morh Tunnel to Zojila Tunnel Road Length 18.475km and ii 14.150 Km long 2-L Bi-directional single tube Zoji-la Tunnel across Zojila Pass on Sonamarg - Kargil section from Km 82 to Km 118 of NH-01 under PMDP is a centrally-funded infrastructure project under Ministry of Road Transport & Highways, in the Roads & Highways sector. The original approved cost is ₹6809.00 Cr.
This project is tracked under the Investment Project Monitoring (IPM) system maintained by DPIIT. Other central projects in the same sector are listed below.
Frequently Asked Questions
- QWhat is IPM project "Construction of i Connecting Road from Z-Morh Tunnel to Zojila Tunnel Road Lengt"?
- Construction of i Connecting Road from Z-Morh Tunnel to Zojila Tunnel Road Length 18.475km and ii 14.150 Km long 2-L Bi-directional single tube Zoji-la Tunnel across Zojila Pass on Sonamarg - Kargil section from Km 82 to Km 118 of NH-01 under PMDP is a centrally-funded infrastructure project under the Ministry of Road Transport & Highways, tracked through the Investment Project Monitoring (IPM) system. Sector: Roads & Highways. State: Andhra Pradesh. Original cost: ₹6809 Cr.
- QWhat is the cost overrun for this Bihar IPM project?
- The original cost of ₹6809 Cr has not been significantly revised. Expenditure: ₹3583 Cr (52.6% of cost). Data as of 2026-08.
- QWhich ministry is responsible for this project?
- Construction of i Connecting Road from Z-Morh Tunnel to Zoji is under the Ministry of Road Transport & Highways in the Roads & Highways sector. Project code: 618412. Bihar is one of the states tracked under the central IPM dashboard for this project.
- QWhat is the IPM dashboard and what does it track?
- The Investment Project Monitoring (IPM) dashboard, maintained by DPIIT (Department for Promotion of Industry and Internal Trade), tracks centrally-funded infrastructure projects worth ₹150 Crore and above. Construction of i Connecting Road from Z-Morh Tunnel to Zoji is one of several Bihar projects tracked under the Roads & Highways sector on the IPM system.