Construction of Four Lane Gola Flyover at Km 99.850 of NH 730 Major Junction with State Highways -93 of Engineering, Procurement and Construction EPC mode in the State of Uttar Pradesh.
Original Cost
₹168 Cr
Baseline estimate
Revised Cost
₹168 Cr
Latest approved cost
Expenditure
₹6 Cr
Spent to date
Utilization
3.8%
Of revised budget
Cost Status
On Budget
No escalation
Remaining
₹162 Cr
Budget left
Budget Utilization
3.8%Spent
₹6 Cr
Remaining
₹162 Cr
Total
₹168 Cr
Budget Split
Project Timeline
Project Approved
Construction / Implementation
Original End Date
29/10/2027
Revised Completion
29/10/2027
Completed
Project Details
Financial Summary
Project Intelligence
Project is within original budget of ₹168 Cr — no cost escalation recorded.
Expenditure stands at ₹6 Cr, which is 3.8% of the revised project cost.
Remaining budget: ₹162 Cr. Tracked under the DPIIT Investment Project Monitoring system.
Sector: Roads & Highways. Ministry: Ministry of Road Transport & Highways.
Construction of Four Lane Gola Flyover at Km 99.850 of NH 730 Major Junction with State Highways -93 of Engineering, Procurement and Construction EPC mode in the State of Uttar Pradesh. is a centrally-funded infrastructure project under Ministry of Road Transport & Highways, in the Roads & Highways sector. The original approved cost is ₹168.00 Cr.
This project is tracked under the Investment Project Monitoring (IPM) system maintained by DPIIT. Other central projects in the same sector are listed below.
Frequently Asked Questions
- QWhat is IPM project "Construction of Four Lane Gola Flyover at Km 99.850 of NH 730 Major Junction wit"?
- Construction of Four Lane Gola Flyover at Km 99.850 of NH 730 Major Junction with State Highways -93 of Engineering, Procurement and Construction EPC mode in the State of Uttar Pradesh. is a centrally-funded infrastructure project under the Ministry of Road Transport & Highways, tracked through the Investment Project Monitoring (IPM) system. Sector: Roads & Highways. State: Uttar Pradesh. Original cost: ₹168 Cr.
- QWhat is the cost overrun for this Bihar IPM project?
- The original cost of ₹168 Cr has not been significantly revised. Expenditure: ₹6 Cr (3.8% of cost). Data as of 2026-08.
- QWhich ministry is responsible for this project?
- Construction of Four Lane Gola Flyover at Km 99.850 of NH 73 is under the Ministry of Road Transport & Highways in the Roads & Highways sector. Project code: 619194. Bihar is one of the states tracked under the central IPM dashboard for this project.
- QWhat is the IPM dashboard and what does it track?
- The Investment Project Monitoring (IPM) dashboard, maintained by DPIIT (Department for Promotion of Industry and Internal Trade), tracks centrally-funded infrastructure projects worth ₹150 Crore and above. Construction of Four Lane Gola Flyover at Km 99.850 of NH 73 is one of several Bihar projects tracked under the Roads & Highways sector on the IPM system.