Revised Cost: ₹223 CrUtilization: 27.2%

Original Cost

₹327 Cr

Baseline estimate

On budget

Revised Cost

₹223 Cr

Latest approved cost

Expenditure

₹61 Cr

Spent to date

Utilization

27.2%

Of revised budget

Stable

Cost Status

On Budget

No escalation

Remaining

₹163 Cr

Budget left

Budget Utilization

27.2%
0%25%50%75%100%

Spent

₹61 Cr

Remaining

₹163 Cr

Total

₹223 Cr

Budget Split

SpentRemaining

Project Timeline

Project Approved

Construction / Implementation

Original End Date

20/10/2027

Revised Completion

20/10/2027

Completed

Project Details

Project Code618525
SectorRoads & Highways
MinistryMinistry of Road Transport & Highways
StateAndhra Pradesh
Data Month2026-08

Financial Summary

Original Cost₹327 Cr
Revised Cost₹223 Cr
Expenditure₹61 Cr
Original End Date20/10/2027
Revised Date20/10/2027

Project Intelligence

Project is within original budget of ₹327 Cr — no cost escalation recorded.

Expenditure stands at ₹61 Cr, which is 27.2% of the revised project cost.

Remaining budget: ₹163 Cr. Tracked under the DPIIT Investment Project Monitoring system.

Sector: Roads & Highways. Ministry: Ministry of Road Transport & Highways.

Construction of flyover at Gammon Junction at Km.903.265 on NH16 including vent at Diwancheruvu junction at Km.902.308 Blackspot ID No.AP03299 in Andhra Pradesh on EPC mode under NHO is a centrally-funded infrastructure project under Ministry of Road Transport & Highways, in the Roads & Highways sector. The original approved cost is ₹327.00 Cr.

This project is tracked under the Investment Project Monitoring (IPM) system maintained by DPIIT. Other central projects in the same sector are listed below.

?

Frequently Asked Questions

QWhat is IPM project "Construction of flyover at Gammon Junction at Km.903.265 on NH16 including vent "?
Construction of flyover at Gammon Junction at Km.903.265 on NH16 including vent at Diwancheruvu junction at Km.902.308 Blackspot ID No.AP03299 in Andhra Pradesh on EPC mode under NHO is a centrally-funded infrastructure project under the Ministry of Road Transport & Highways, tracked through the Investment Project Monitoring (IPM) system. Sector: Roads & Highways. State: Andhra Pradesh. Original cost: ₹327 Cr.
QWhat is the cost overrun for this Bihar IPM project?
The original cost was ₹327 Cr and has been revised to ₹223 Cr — a cost overrun of -31.7%. Expenditure to date: ₹61 Cr (27.2% of revised cost). Data as of 2026-08.
QWhich ministry is responsible for this project?
Construction of flyover at Gammon Junction at Km.903.265 on is under the Ministry of Road Transport & Highways in the Roads & Highways sector. Project code: 618525. Bihar is one of the states tracked under the central IPM dashboard for this project.
QWhat is the IPM dashboard and what does it track?
The Investment Project Monitoring (IPM) dashboard, maintained by DPIIT (Department for Promotion of Industry and Internal Trade), tracks centrally-funded infrastructure projects worth ₹150 Crore and above. Construction of flyover at Gammon Junction at Km.903.265 on is one of several Bihar projects tracked under the Roads & Highways sector on the IPM system.