Construction of Dubrajpur Bypass with 4-lane configuration of length 5.676 km on NH-60 new NH-14 from design chainage 0.00 existing km 316.135 on NH-60 to design chainage 5.676 existing km 320.980 on NH-60 in the district of Birbhum, West Bengal under Annual Plan 2022-23 in EPC Mode- reg. Job. No. 014-WB-2022-23/518 .
Original Cost
₹561 Cr
Baseline estimate
Revised Cost
₹561 Cr
Latest approved cost
Expenditure
₹156 Cr
Spent to date
Utilization
27.7%
Of revised budget
Cost Status
On Budget
No escalation
Remaining
₹405 Cr
Budget left
Budget Utilization
27.7%Spent
₹156 Cr
Remaining
₹405 Cr
Total
₹561 Cr
Budget Split
Project Timeline
Project Approved
Construction / Implementation
Original End Date
18/12/2027
Revised Completion
17/12/2027
Completed
Project Details
Financial Summary
Project Intelligence
Project is within original budget of ₹561 Cr — no cost escalation recorded.
Expenditure stands at ₹156 Cr, which is 27.7% of the revised project cost.
Remaining budget: ₹405 Cr. Tracked under the DPIIT Investment Project Monitoring system.
Sector: Roads & Highways. Ministry: Ministry of Road Transport & Highways.
Construction of Dubrajpur Bypass with 4-lane configuration of length 5.676 km on NH-60 new NH-14 from design chainage 0.00 existing km 316.135 on NH-60 to design chainage 5.676 existing km 320.980 on NH-60 in the district of Birbhum, West Bengal under Annual Plan 2022-23 in EPC Mode- reg. Job. No. 014-WB-2022-23/518 . is a centrally-funded infrastructure project under Ministry of Road Transport & Highways, in the Roads & Highways sector. The original approved cost is ₹561.00 Cr.
This project is tracked under the Investment Project Monitoring (IPM) system maintained by DPIIT. Other central projects in the same sector are listed below.
Frequently Asked Questions
- QWhat is IPM project "Construction of Dubrajpur Bypass with 4-lane configuration of length 5.676 km on"?
- Construction of Dubrajpur Bypass with 4-lane configuration of length 5.676 km on NH-60 new NH-14 from design chainage 0.00 existing km 316.135 on NH-60 to design chainage 5.676 existing km 320.980 on NH-60 in the district of Birbhum, West Bengal under Annual Plan 2022-23 in EPC Mode- reg. Job. No. 014-WB-2022-23/518 . is a centrally-funded infrastructure project under the Ministry of Road Transport & Highways, tracked through the Investment Project Monitoring (IPM) system. Sector: Roads & Highways. State: West Bengal. Original cost: ₹561 Cr.
- QWhat is the cost overrun for this Bihar IPM project?
- The original cost of ₹561 Cr has not been significantly revised. Expenditure: ₹156 Cr (27.7% of cost). Data as of 2026-08.
- QWhich ministry is responsible for this project?
- Construction of Dubrajpur Bypass with 4-lane configuration o is under the Ministry of Road Transport & Highways in the Roads & Highways sector. Project code: 619004. Bihar is one of the states tracked under the central IPM dashboard for this project.
- QWhat is the IPM dashboard and what does it track?
- The Investment Project Monitoring (IPM) dashboard, maintained by DPIIT (Department for Promotion of Industry and Internal Trade), tracks centrally-funded infrastructure projects worth ₹150 Crore and above. Construction of Dubrajpur Bypass with 4-lane configuration o is one of several Bihar projects tracked under the Roads & Highways sector on the IPM system.