Construction of Approach Road to Rail-cum- Road Bridge across river Ganga at Munger Ghat NH-333 B
Original Cost
₹538 Cr
Baseline estimate
Revised Cost
₹634 Cr
Latest approved cost
Expenditure
₹574 Cr
Spent to date
Utilization
90.6%
Of revised budget
Cost Status
+17.8%
+₹96 Cr increase
Remaining
₹60 Cr
Budget left
Budget Utilization
90.6%Spent
₹574 Cr
Remaining
₹60 Cr
Total
₹634 Cr
Budget Split
Cost Escalation Analysis
Original Cost
₹538 Cr
Revised Cost
₹634 Cr
Increase
+₹96 Cr
Escalation
+17.8%
Project Timeline
Project Approved
Construction / Implementation
Original End Date
28/05/2021
Revised Completion
30/09/2026
Completed
Project Details
Financial Summary
Project Intelligence
Cost has increased by ₹96 Cr (17.8%) from the original estimate of ₹538 Cr.
Expenditure stands at ₹574 Cr, which is 90.6% of the revised project cost.
Remaining budget: ₹60 Cr. Tracked under the DPIIT Investment Project Monitoring system.
Sector: Roads & Highways. Ministry: Ministry of Road Transport & Highways.
Construction of Approach Road to Rail-cum- Road Bridge across river Ganga at Munger Ghat NH-333 B is a centrally-funded infrastructure project under Ministry of Road Transport & Highways, in the Roads & Highways sector. The original approved cost is ₹538.00 Cr, later revised to ₹633.91 Cr.
This project is tracked under the Investment Project Monitoring (IPM) system maintained by DPIIT. Other central projects in the same sector are listed below.
Frequently Asked Questions
- QWhat is IPM project "Construction of Approach Road to Rail-cum- Road Bridge across river Ganga at Mun"?
- Construction of Approach Road to Rail-cum- Road Bridge across river Ganga at Munger Ghat NH-333 B is a centrally-funded infrastructure project under the Ministry of Road Transport & Highways, tracked through the Investment Project Monitoring (IPM) system. Sector: Roads & Highways. State: Bihar. Original cost: ₹538 Cr.
- QWhat is the cost overrun for this Bihar IPM project?
- The original cost was ₹538 Cr and has been revised to ₹634 Cr — a cost overrun of +17.8%. Expenditure to date: ₹574 Cr (90.6% of revised cost). Data as of 2026-08.
- QWhich ministry is responsible for this project?
- Construction of Approach Road to Rail-cum- Road Bridge acros is under the Ministry of Road Transport & Highways in the Roads & Highways sector. Project code: 619301. Bihar is one of the states tracked under the central IPM dashboard for this project.
- QWhat is the IPM dashboard and what does it track?
- The Investment Project Monitoring (IPM) dashboard, maintained by DPIIT (Department for Promotion of Industry and Internal Trade), tracks centrally-funded infrastructure projects worth ₹150 Crore and above. Construction of Approach Road to Rail-cum- Road Bridge acros is one of several Bihar projects tracked under the Roads & Highways sector on the IPM system.