Roads & HighwaysIPM · Central Project#618742

Construction of 6-lane Greenfield corridor from Ramnagar to Kacchi Dargah NH-119D from Km 109700 to Km 122300, including widening of the existing NH-31 from Km 196700 to Km 198600, as part of the Amas-Darbhanga.

Ministry of Road Transport & HighwaysBihar
Revised Cost: ₹1113 CrUtilization: 1.2%

Original Cost

₹1113 Cr

Baseline estimate

On budget

Revised Cost

₹1113 Cr

Latest approved cost

Expenditure

₹13 Cr

Spent to date

Utilization

1.2%

Of revised budget

Stable

Cost Status

On Budget

No escalation

Remaining

₹1100 Cr

Budget left

Budget Utilization

1.2%
0%25%50%75%100%

Spent

₹13 Cr

Remaining

₹1100 Cr

Total

₹1113 Cr

Budget Split

SpentRemaining

Project Timeline

Project Approved

Construction / Implementation

Original End Date

23/04/2028

Revised Completion

23/04/2028

Completed

Project Details

Project Code618742
SectorRoads & Highways
MinistryMinistry of Road Transport & Highways
StateBihar
Data Month2026-08

Financial Summary

Original Cost₹1113 Cr
Revised Cost₹1113 Cr
Expenditure₹13 Cr
Original End Date23/04/2028
Revised Date23/04/2028

Project Intelligence

Project is within original budget of ₹1113 Cr — no cost escalation recorded.

Expenditure stands at ₹13 Cr, which is 1.2% of the revised project cost.

Remaining budget: ₹1100 Cr. Tracked under the DPIIT Investment Project Monitoring system.

Sector: Roads & Highways. Ministry: Ministry of Road Transport & Highways.

Construction of 6-lane Greenfield corridor from Ramnagar to Kacchi Dargah NH-119D from Km 109700 to Km 122300, including widening of the existing NH-31 from Km 196700 to Km 198600, as part of the Amas-Darbhanga. is a centrally-funded infrastructure project under Ministry of Road Transport & Highways, in the Roads & Highways sector. The original approved cost is ₹1113.00 Cr.

This project is tracked under the Investment Project Monitoring (IPM) system maintained by DPIIT. Other central projects in the same sector are listed below.

?

Frequently Asked Questions

QWhat is IPM project "Construction of 6-lane Greenfield corridor from Ramnagar to Kacchi Dargah NH-119"?
Construction of 6-lane Greenfield corridor from Ramnagar to Kacchi Dargah NH-119D from Km 109700 to Km 122300, including widening of the existing NH-31 from Km 196700 to Km 198600, as part of the Amas-Darbhanga. is a centrally-funded infrastructure project under the Ministry of Road Transport & Highways, tracked through the Investment Project Monitoring (IPM) system. Sector: Roads & Highways. State: Bihar. Original cost: ₹1113 Cr.
QWhat is the cost overrun for this Bihar IPM project?
The original cost of ₹1113 Cr has not been significantly revised. Expenditure: ₹13 Cr (1.2% of cost). Data as of 2026-08.
QWhich ministry is responsible for this project?
Construction of 6-lane Greenfield corridor from Ramnagar to is under the Ministry of Road Transport & Highways in the Roads & Highways sector. Project code: 618742. Bihar is one of the states tracked under the central IPM dashboard for this project.
QWhat is the IPM dashboard and what does it track?
The Investment Project Monitoring (IPM) dashboard, maintained by DPIIT (Department for Promotion of Industry and Internal Trade), tracks centrally-funded infrastructure projects worth ₹150 Crore and above. Construction of 6-lane Greenfield corridor from Ramnagar to is one of several Bihar projects tracked under the Roads & Highways sector on the IPM system.