Construction of 6-lane Greenfield corridor from Ramnagar to Kacchi Dargah NH-119D from Km 109700 to Km 122300, including widening of the existing NH-31 from Km 196700 to Km 198600, as part of the Amas-Darbhanga.
Original Cost
₹1113 Cr
Baseline estimate
Revised Cost
₹1113 Cr
Latest approved cost
Expenditure
₹13 Cr
Spent to date
Utilization
1.2%
Of revised budget
Cost Status
On Budget
No escalation
Remaining
₹1100 Cr
Budget left
Budget Utilization
1.2%Spent
₹13 Cr
Remaining
₹1100 Cr
Total
₹1113 Cr
Budget Split
Project Timeline
Project Approved
Construction / Implementation
Original End Date
23/04/2028
Revised Completion
23/04/2028
Completed
Project Details
Financial Summary
Project Intelligence
Project is within original budget of ₹1113 Cr — no cost escalation recorded.
Expenditure stands at ₹13 Cr, which is 1.2% of the revised project cost.
Remaining budget: ₹1100 Cr. Tracked under the DPIIT Investment Project Monitoring system.
Sector: Roads & Highways. Ministry: Ministry of Road Transport & Highways.
Construction of 6-lane Greenfield corridor from Ramnagar to Kacchi Dargah NH-119D from Km 109700 to Km 122300, including widening of the existing NH-31 from Km 196700 to Km 198600, as part of the Amas-Darbhanga. is a centrally-funded infrastructure project under Ministry of Road Transport & Highways, in the Roads & Highways sector. The original approved cost is ₹1113.00 Cr.
This project is tracked under the Investment Project Monitoring (IPM) system maintained by DPIIT. Other central projects in the same sector are listed below.
Frequently Asked Questions
- QWhat is IPM project "Construction of 6-lane Greenfield corridor from Ramnagar to Kacchi Dargah NH-119"?
- Construction of 6-lane Greenfield corridor from Ramnagar to Kacchi Dargah NH-119D from Km 109700 to Km 122300, including widening of the existing NH-31 from Km 196700 to Km 198600, as part of the Amas-Darbhanga. is a centrally-funded infrastructure project under the Ministry of Road Transport & Highways, tracked through the Investment Project Monitoring (IPM) system. Sector: Roads & Highways. State: Bihar. Original cost: ₹1113 Cr.
- QWhat is the cost overrun for this Bihar IPM project?
- The original cost of ₹1113 Cr has not been significantly revised. Expenditure: ₹13 Cr (1.2% of cost). Data as of 2026-08.
- QWhich ministry is responsible for this project?
- Construction of 6-lane Greenfield corridor from Ramnagar to is under the Ministry of Road Transport & Highways in the Roads & Highways sector. Project code: 618742. Bihar is one of the states tracked under the central IPM dashboard for this project.
- QWhat is the IPM dashboard and what does it track?
- The Investment Project Monitoring (IPM) dashboard, maintained by DPIIT (Department for Promotion of Industry and Internal Trade), tracks centrally-funded infrastructure projects worth ₹150 Crore and above. Construction of 6-lane Greenfield corridor from Ramnagar to is one of several Bihar projects tracked under the Roads & Highways sector on the IPM system.