Construction of 6-lane bridge on Ganga on NH-96 and its approaches in Phaphamau Allahabad on EPC mode
Original Cost
₹1948 Cr
Baseline estimate
Revised Cost
₹1465 Cr
Latest approved cost
Expenditure
₹1295 Cr
Spent to date
Utilization
88.4%
Of revised budget
Cost Status
On Budget
No escalation
Remaining
₹170 Cr
Budget left
Budget Utilization
88.4%Spent
₹1295 Cr
Remaining
₹170 Cr
Total
₹1465 Cr
Budget Split
Project Timeline
Project Approved
Construction / Implementation
Original End Date
15/02/2024
Revised Completion
30/09/2026
Completed
Project Details
Financial Summary
Project Intelligence
Project is within original budget of ₹1948 Cr — no cost escalation recorded.
Expenditure stands at ₹1295 Cr, which is 88.4% of the revised project cost.
Remaining budget: ₹170 Cr. Tracked under the DPIIT Investment Project Monitoring system.
Sector: Roads & Highways. Ministry: Ministry of Road Transport & Highways.
Construction of 6-lane bridge on Ganga on NH-96 and its approaches in Phaphamau Allahabad on EPC mode is a centrally-funded infrastructure project under Ministry of Road Transport & Highways, in the Roads & Highways sector. The original approved cost is ₹1948.00 Cr.
This project is tracked under the Investment Project Monitoring (IPM) system maintained by DPIIT. Other central projects in the same sector are listed below.
Frequently Asked Questions
- QWhat is IPM project "Construction of 6-lane bridge on Ganga on NH-96 and its approaches in Phaphamau "?
- Construction of 6-lane bridge on Ganga on NH-96 and its approaches in Phaphamau Allahabad on EPC mode is a centrally-funded infrastructure project under the Ministry of Road Transport & Highways, tracked through the Investment Project Monitoring (IPM) system. Sector: Roads & Highways. State: Uttar Pradesh. Original cost: ₹1948 Cr.
- QWhat is the cost overrun for this Bihar IPM project?
- The original cost was ₹1948 Cr and has been revised to ₹1465 Cr — a cost overrun of -24.8%. Expenditure to date: ₹1295 Cr (88.4% of revised cost). Data as of 2026-08.
- QWhich ministry is responsible for this project?
- Construction of 6-lane bridge on Ganga on NH-96 and its appr is under the Ministry of Road Transport & Highways in the Roads & Highways sector. Project code: 618233. Bihar is one of the states tracked under the central IPM dashboard for this project.
- QWhat is the IPM dashboard and what does it track?
- The Investment Project Monitoring (IPM) dashboard, maintained by DPIIT (Department for Promotion of Industry and Internal Trade), tracks centrally-funded infrastructure projects worth ₹150 Crore and above. Construction of 6-lane bridge on Ganga on NH-96 and its appr is one of several Bihar projects tracked under the Roads & Highways sector on the IPM system.