Construction of 4 lane with paved shoulder from Existing Ch. 14200 to 24320 Design Ch. 14200 to 24400, Ch. 33760 to 42780 Design Ch. 35300 to 44294 & Ch. 43440 to 47020 Design Ch. 44958 to 48500 Delina Flyover including construction of flyover length 1.704 km of total length 22.736 kms in AOR of 760 BRTF on road SRINAGAR BARAMULA URI NH-01 in the UT of Jammu & Kashmir under project BEACON, Border Roads Organization BRO Package-IJob No NH-1-J&K-2022-23-110
Original Cost
₹823 Cr
Baseline estimate
Revised Cost
₹823 Cr
Latest approved cost
Expenditure
₹548 Cr
Spent to date
Utilization
66.5%
Of revised budget
Cost Status
On Budget
No escalation
Remaining
₹276 Cr
Budget left
Budget Utilization
66.5%Spent
₹548 Cr
Remaining
₹276 Cr
Total
₹823 Cr
Budget Split
Project Timeline
Project Approved
Construction / Implementation
Original End Date
24/08/2025
Revised Completion
31/12/2026
Completed
Project Details
Financial Summary
Project Intelligence
Project is within original budget of ₹823 Cr — no cost escalation recorded.
Expenditure stands at ₹548 Cr, which is 66.5% of the revised project cost.
Remaining budget: ₹276 Cr. Tracked under the DPIIT Investment Project Monitoring system.
Sector: Roads & Highways. Ministry: Ministry of Road Transport & Highways.
Construction of 4 lane with paved shoulder from Existing Ch. 14200 to 24320 Design Ch. 14200 to 24400, Ch. 33760 to 42780 Design Ch. 35300 to 44294 & Ch. 43440 to 47020 Design Ch. 44958 to 48500 Delina Flyover including construction of flyover length 1.704 km of total length 22.736 kms in AOR of 760 BRTF on road SRINAGAR BARAMULA URI NH-01 in the UT of Jammu & Kashmir under project BEACON, Border Roads Organization BRO Package-IJob No NH-1-J&K-2022-23-110 is a centrally-funded infrastructure project under Ministry of Road Transport & Highways, in the Roads & Highways sector. The original approved cost is ₹823.00 Cr.
This project is tracked under the Investment Project Monitoring (IPM) system maintained by DPIIT. Other central projects in the same sector are listed below.
Frequently Asked Questions
- QWhat is IPM project "Construction of 4 lane with paved shoulder from Existing Ch. 14200 to 24320 Desi"?
- Construction of 4 lane with paved shoulder from Existing Ch. 14200 to 24320 Design Ch. 14200 to 24400, Ch. 33760 to 42780 Design Ch. 35300 to 44294 & Ch. 43440 to 47020 Design Ch. 44958 to 48500 Delina Flyover including construction of flyover length 1.704 km of total length 22.736 kms in AOR of 760 BRTF on road SRINAGAR BARAMULA URI NH-01 in the UT of Jammu & Kashmir under project BEACON, Border Roads Organization BRO Package-IJob No NH-1-J&K-2022-23-110 is a centrally-funded infrastructure project under the Ministry of Road Transport & Highways, tracked through the Investment Project Monitoring (IPM) system. Sector: Roads & Highways. State: Jammu & Kashmir. Original cost: ₹823 Cr.
- QWhat is the cost overrun for this Bihar IPM project?
- The original cost of ₹823 Cr has not been significantly revised. Expenditure: ₹548 Cr (66.5% of cost). Data as of 2026-08.
- QWhich ministry is responsible for this project?
- Construction of 4 lane with paved shoulder from Existing Ch. is under the Ministry of Road Transport & Highways in the Roads & Highways sector. Project code: 618205. Bihar is one of the states tracked under the central IPM dashboard for this project.
- QWhat is the IPM dashboard and what does it track?
- The Investment Project Monitoring (IPM) dashboard, maintained by DPIIT (Department for Promotion of Industry and Internal Trade), tracks centrally-funded infrastructure projects worth ₹150 Crore and above. Construction of 4 lane with paved shoulder from Existing Ch. is one of several Bihar projects tracked under the Roads & Highways sector on the IPM system.