Roads & HighwaysIPM · Central Project#618247

Construction of 4 lane Mirzapur bypass including bridge over river Ganga from km 0.000 to km 15.000 of NH 135A in the State of Uttar Pradesh on HAM Mode.

Ministry of Road Transport & HighwaysUttar Pradesh
Revised Cost: ₹1709 CrUtilization: 20.0%

Original Cost

₹1709 Cr

Baseline estimate

On budget

Revised Cost

₹1709 Cr

Latest approved cost

Expenditure

₹341 Cr

Spent to date

Utilization

20.0%

Of revised budget

Stable

Cost Status

On Budget

No escalation

Remaining

₹1368 Cr

Budget left

Budget Utilization

20.0%
0%25%50%75%100%

Spent

₹341 Cr

Remaining

₹1368 Cr

Total

₹1709 Cr

Budget Split

SpentRemaining

Project Timeline

Project Approved

Construction / Implementation

Original End Date

17/01/2029

Revised Completion

17/01/2029

Completed

Project Details

Project Code618247
SectorRoads & Highways
MinistryMinistry of Road Transport & Highways
StateUttar Pradesh
Data Month2026-08

Financial Summary

Original Cost₹1709 Cr
Revised Cost₹1709 Cr
Expenditure₹341 Cr
Original End Date17/01/2029
Revised Date17/01/2029

Project Intelligence

Project is within original budget of ₹1709 Cr — no cost escalation recorded.

Expenditure stands at ₹341 Cr, which is 20.0% of the revised project cost.

Remaining budget: ₹1368 Cr. Tracked under the DPIIT Investment Project Monitoring system.

Sector: Roads & Highways. Ministry: Ministry of Road Transport & Highways.

Construction of 4 lane Mirzapur bypass including bridge over river Ganga from km 0.000 to km 15.000 of NH 135A in the State of Uttar Pradesh on HAM Mode. is a centrally-funded infrastructure project under Ministry of Road Transport & Highways, in the Roads & Highways sector. The original approved cost is ₹1709.00 Cr.

This project is tracked under the Investment Project Monitoring (IPM) system maintained by DPIIT. Other central projects in the same sector are listed below.

?

Frequently Asked Questions

QWhat is IPM project "Construction of 4 lane Mirzapur bypass including bridge over river Ganga from km"?
Construction of 4 lane Mirzapur bypass including bridge over river Ganga from km 0.000 to km 15.000 of NH 135A in the State of Uttar Pradesh on HAM Mode. is a centrally-funded infrastructure project under the Ministry of Road Transport & Highways, tracked through the Investment Project Monitoring (IPM) system. Sector: Roads & Highways. State: Uttar Pradesh. Original cost: ₹1709 Cr.
QWhat is the cost overrun for this Bihar IPM project?
The original cost of ₹1709 Cr has not been significantly revised. Expenditure: ₹341 Cr (20.0% of cost). Data as of 2026-08.
QWhich ministry is responsible for this project?
Construction of 4 lane Mirzapur bypass including bridge over is under the Ministry of Road Transport & Highways in the Roads & Highways sector. Project code: 618247. Bihar is one of the states tracked under the central IPM dashboard for this project.
QWhat is the IPM dashboard and what does it track?
The Investment Project Monitoring (IPM) dashboard, maintained by DPIIT (Department for Promotion of Industry and Internal Trade), tracks centrally-funded infrastructure projects worth ₹150 Crore and above. Construction of 4 lane Mirzapur bypass including bridge over is one of several Bihar projects tracked under the Roads & Highways sector on the IPM system.