Roads & HighwaysIPM · Central Project#619057

Construction of 4-Lane Badarpur Bypass from Design Chainage km 27300 at crossing with NH-6 Old NH-44 Near Siddeswar Pt.-I Village to Design Chainage km 38600 on NH-37 Old NH-44 at Kandigram Chaita Village on Silchar - Churaibari stretch in the State of Assam on EPC Mode under Bharatmala Pariyojana in Economic Corridors Silchar- Churaibari Pkg-3

Ministry of Road Transport & HighwaysAssam
Revised Cost: ₹574 CrUtilization: 57.7%

Original Cost

₹574 Cr

Baseline estimate

On budget

Revised Cost

₹574 Cr

Latest approved cost

Expenditure

₹331 Cr

Spent to date

Utilization

57.7%

Of revised budget

Stable

Cost Status

On Budget

No escalation

Remaining

₹243 Cr

Budget left

Budget Utilization

57.7%
0%25%50%75%100%

Spent

₹331 Cr

Remaining

₹243 Cr

Total

₹574 Cr

Budget Split

SpentRemaining

Project Timeline

Project Approved

Construction / Implementation

Original End Date

09/08/2026

Revised Completion

31/03/2027

Completed

Project Details

Project Code619057
SectorRoads & Highways
MinistryMinistry of Road Transport & Highways
StateAssam
Data Month2026-08

Financial Summary

Original Cost₹574 Cr
Revised Cost₹574 Cr
Expenditure₹331 Cr
Original End Date09/08/2026
Revised Date31/03/2027

Project Intelligence

Project is within original budget of ₹574 Cr — no cost escalation recorded.

Expenditure stands at ₹331 Cr, which is 57.7% of the revised project cost.

Remaining budget: ₹243 Cr. Tracked under the DPIIT Investment Project Monitoring system.

Sector: Roads & Highways. Ministry: Ministry of Road Transport & Highways.

Construction of 4-Lane Badarpur Bypass from Design Chainage km 27300 at crossing with NH-6 Old NH-44 Near Siddeswar Pt.-I Village to Design Chainage km 38600 on NH-37 Old NH-44 at Kandigram Chaita Village on Silchar - Churaibari stretch in the State of Assam on EPC Mode under Bharatmala Pariyojana in Economic Corridors Silchar- Churaibari Pkg-3 is a centrally-funded infrastructure project under Ministry of Road Transport & Highways, in the Roads & Highways sector. The original approved cost is ₹574.00 Cr.

This project is tracked under the Investment Project Monitoring (IPM) system maintained by DPIIT. Other central projects in the same sector are listed below.

?

Frequently Asked Questions

QWhat is IPM project "Construction of 4-Lane Badarpur Bypass from Design Chainage km 27300 at crossing"?
Construction of 4-Lane Badarpur Bypass from Design Chainage km 27300 at crossing with NH-6 Old NH-44 Near Siddeswar Pt.-I Village to Design Chainage km 38600 on NH-37 Old NH-44 at Kandigram Chaita Village on Silchar - Churaibari stretch in the State of Assam on EPC Mode under Bharatmala Pariyojana in Economic Corridors Silchar- Churaibari Pkg-3 is a centrally-funded infrastructure project under the Ministry of Road Transport & Highways, tracked through the Investment Project Monitoring (IPM) system. Sector: Roads & Highways. State: Assam. Original cost: ₹574 Cr.
QWhat is the cost overrun for this Bihar IPM project?
The original cost of ₹574 Cr has not been significantly revised. Expenditure: ₹331 Cr (57.7% of cost). Data as of 2026-08.
QWhich ministry is responsible for this project?
Construction of 4-Lane Badarpur Bypass from Design Chainage is under the Ministry of Road Transport & Highways in the Roads & Highways sector. Project code: 619057. Bihar is one of the states tracked under the central IPM dashboard for this project.
QWhat is the IPM dashboard and what does it track?
The Investment Project Monitoring (IPM) dashboard, maintained by DPIIT (Department for Promotion of Industry and Internal Trade), tracks centrally-funded infrastructure projects worth ₹150 Crore and above. Construction of 4-Lane Badarpur Bypass from Design Chainage is one of several Bihar projects tracked under the Roads & Highways sector on the IPM system.