Construction of 4-Lane Badarpur Bypass from Design Chainage km 27300 at crossing with NH-6 Old NH-44 Near Siddeswar Pt.-I Village to Design Chainage km 38600 on NH-37 Old NH-44 at Kandigram Chaita Village on Silchar - Churaibari stretch in the State of Assam on EPC Mode under Bharatmala Pariyojana in Economic Corridors Silchar- Churaibari Pkg-3
Original Cost
₹574 Cr
Baseline estimate
Revised Cost
₹574 Cr
Latest approved cost
Expenditure
₹331 Cr
Spent to date
Utilization
57.7%
Of revised budget
Cost Status
On Budget
No escalation
Remaining
₹243 Cr
Budget left
Budget Utilization
57.7%Spent
₹331 Cr
Remaining
₹243 Cr
Total
₹574 Cr
Budget Split
Project Timeline
Project Approved
Construction / Implementation
Original End Date
09/08/2026
Revised Completion
31/03/2027
Completed
Project Details
Financial Summary
Project Intelligence
Project is within original budget of ₹574 Cr — no cost escalation recorded.
Expenditure stands at ₹331 Cr, which is 57.7% of the revised project cost.
Remaining budget: ₹243 Cr. Tracked under the DPIIT Investment Project Monitoring system.
Sector: Roads & Highways. Ministry: Ministry of Road Transport & Highways.
Construction of 4-Lane Badarpur Bypass from Design Chainage km 27300 at crossing with NH-6 Old NH-44 Near Siddeswar Pt.-I Village to Design Chainage km 38600 on NH-37 Old NH-44 at Kandigram Chaita Village on Silchar - Churaibari stretch in the State of Assam on EPC Mode under Bharatmala Pariyojana in Economic Corridors Silchar- Churaibari Pkg-3 is a centrally-funded infrastructure project under Ministry of Road Transport & Highways, in the Roads & Highways sector. The original approved cost is ₹574.00 Cr.
This project is tracked under the Investment Project Monitoring (IPM) system maintained by DPIIT. Other central projects in the same sector are listed below.
Frequently Asked Questions
- QWhat is IPM project "Construction of 4-Lane Badarpur Bypass from Design Chainage km 27300 at crossing"?
- Construction of 4-Lane Badarpur Bypass from Design Chainage km 27300 at crossing with NH-6 Old NH-44 Near Siddeswar Pt.-I Village to Design Chainage km 38600 on NH-37 Old NH-44 at Kandigram Chaita Village on Silchar - Churaibari stretch in the State of Assam on EPC Mode under Bharatmala Pariyojana in Economic Corridors Silchar- Churaibari Pkg-3 is a centrally-funded infrastructure project under the Ministry of Road Transport & Highways, tracked through the Investment Project Monitoring (IPM) system. Sector: Roads & Highways. State: Assam. Original cost: ₹574 Cr.
- QWhat is the cost overrun for this Bihar IPM project?
- The original cost of ₹574 Cr has not been significantly revised. Expenditure: ₹331 Cr (57.7% of cost). Data as of 2026-08.
- QWhich ministry is responsible for this project?
- Construction of 4-Lane Badarpur Bypass from Design Chainage is under the Ministry of Road Transport & Highways in the Roads & Highways sector. Project code: 619057. Bihar is one of the states tracked under the central IPM dashboard for this project.
- QWhat is the IPM dashboard and what does it track?
- The Investment Project Monitoring (IPM) dashboard, maintained by DPIIT (Department for Promotion of Industry and Internal Trade), tracks centrally-funded infrastructure projects worth ₹150 Crore and above. Construction of 4-Lane Badarpur Bypass from Design Chainage is one of several Bihar projects tracked under the Roads & Highways sector on the IPM system.