Roads & HighwaysIPM · Central Project#618424

Construction of 2-Laning with hard shoulders of Hayuliang Hawai bypass Road on EPC basis from design Km. 51.825 to Km. 63.131 Existing Km 45.050 of HayuliangHawai road to Hawai Town under SARDP-NE -Balance work Pkg - IV

Ministry of Road Transport & HighwaysArunachal Pradesh
Revised Cost: ₹217 CrUtilization: 0.0%

Original Cost

₹257 Cr

Baseline estimate

On budget

Revised Cost

₹217 Cr

Latest approved cost

Expenditure

₹0 Cr

Spent to date

Utilization

0.0%

Of revised budget

Stable

Cost Status

On Budget

No escalation

Remaining

₹217 Cr

Budget left

Budget Utilization

0.0%
0%25%50%75%100%

Spent

₹0 Cr

Remaining

₹217 Cr

Total

₹217 Cr

Budget Split

SpentRemaining

Project Timeline

Project Approved

Construction / Implementation

Original End Date

02/05/2023

Revised Completion

02/07/2026

Completed

Project Details

Project Code618424
SectorRoads & Highways
MinistryMinistry of Road Transport & Highways
StateArunachal Pradesh
Data Month2026-01

Financial Summary

Original Cost₹257 Cr
Revised Cost₹217 Cr
Expenditure₹0 Cr
Original End Date02/05/2023
Revised Date02/07/2026

Project Intelligence

Project is within original budget of ₹257 Cr — no cost escalation recorded.

Expenditure stands at ₹0 Cr, which is 0.0% of the revised project cost.

Remaining budget: ₹217 Cr. Tracked under the DPIIT Investment Project Monitoring system.

Sector: Roads & Highways. Ministry: Ministry of Road Transport & Highways.

Construction of 2-Laning with hard shoulders of Hayuliang Hawai bypass Road on EPC basis from design Km. 51.825 to Km. 63.131 Existing Km 45.050 of HayuliangHawai road to Hawai Town under SARDP-NE -Balance work Pkg - IV is a centrally-funded infrastructure project under Ministry of Road Transport & Highways, in the Roads & Highways sector. The original approved cost is ₹257.00 Cr.

This project is tracked under the Investment Project Monitoring (IPM) system maintained by DPIIT. Other central projects in the same sector are listed below.

?

Frequently Asked Questions

QWhat is IPM project "Construction of 2-Laning with hard shoulders of Hayuliang Hawai bypass Road on E"?
Construction of 2-Laning with hard shoulders of Hayuliang Hawai bypass Road on EPC basis from design Km. 51.825 to Km. 63.131 Existing Km 45.050 of HayuliangHawai road to Hawai Town under SARDP-NE -Balance work Pkg - IV is a centrally-funded infrastructure project under the Ministry of Road Transport & Highways, tracked through the Investment Project Monitoring (IPM) system. Sector: Roads & Highways. State: Arunachal Pradesh. Original cost: ₹257 Cr.
QWhat is the cost overrun for this Bihar IPM project?
The original cost was ₹257 Cr and has been revised to ₹217 Cr — a cost overrun of -15.7%. Expenditure to date: ₹0 Cr (N/A% of revised cost). Data as of 2026-01.
QWhich ministry is responsible for this project?
Construction of 2-Laning with hard shoulders of Hayuliang Ha is under the Ministry of Road Transport & Highways in the Roads & Highways sector. Project code: 618424. Bihar is one of the states tracked under the central IPM dashboard for this project.
QWhat is the IPM dashboard and what does it track?
The Investment Project Monitoring (IPM) dashboard, maintained by DPIIT (Department for Promotion of Industry and Internal Trade), tracks centrally-funded infrastructure projects worth ₹150 Crore and above. Construction of 2-Laning with hard shoulders of Hayuliang Ha is one of several Bihar projects tracked under the Roads & Highways sector on the IPM system.