Construction of 2-laning with Hard shoulder road of Ukhrul - Tolloi - Tadubi section of NH-102A from Design Chainage 50.850 km to 81.870 km in the State of Manipur on EPC mode under NHO-TSP Package -3
Original Cost
₹316 Cr
Baseline estimate
Revised Cost
₹316 Cr
Latest approved cost
Expenditure
₹257 Cr
Spent to date
Utilization
81.5%
Of revised budget
Cost Status
On Budget
No escalation
Remaining
₹59 Cr
Budget left
Budget Utilization
81.5%Spent
₹257 Cr
Remaining
₹59 Cr
Total
₹316 Cr
Budget Split
Project Timeline
Project Approved
Construction / Implementation
Original End Date
20/01/2025
Revised Completion
31/12/2026
Completed
Project Details
Financial Summary
Project Intelligence
Project is within original budget of ₹316 Cr — no cost escalation recorded.
Expenditure stands at ₹257 Cr, which is 81.5% of the revised project cost.
Remaining budget: ₹59 Cr. Tracked under the DPIIT Investment Project Monitoring system.
Sector: Roads & Highways. Ministry: Ministry of Road Transport & Highways.
Construction of 2-laning with Hard shoulder road of Ukhrul - Tolloi - Tadubi section of NH-102A from Design Chainage 50.850 km to 81.870 km in the State of Manipur on EPC mode under NHO-TSP Package -3 is a centrally-funded infrastructure project under Ministry of Road Transport & Highways, in the Roads & Highways sector. The original approved cost is ₹316.00 Cr.
This project is tracked under the Investment Project Monitoring (IPM) system maintained by DPIIT. Other central projects in the same sector are listed below.
Frequently Asked Questions
- QWhat is IPM project "Construction of 2-laning with Hard shoulder road of Ukhrul - Tolloi - Tadubi sec"?
- Construction of 2-laning with Hard shoulder road of Ukhrul - Tolloi - Tadubi section of NH-102A from Design Chainage 50.850 km to 81.870 km in the State of Manipur on EPC mode under NHO-TSP Package -3 is a centrally-funded infrastructure project under the Ministry of Road Transport & Highways, tracked through the Investment Project Monitoring (IPM) system. Sector: Roads & Highways. State: Manipur. Original cost: ₹316 Cr.
- QWhat is the cost overrun for this Bihar IPM project?
- The original cost of ₹316 Cr has not been significantly revised. Expenditure: ₹257 Cr (81.5% of cost). Data as of 2026-08.
- QWhich ministry is responsible for this project?
- Construction of 2-laning with Hard shoulder road of Ukhrul - is under the Ministry of Road Transport & Highways in the Roads & Highways sector. Project code: 618388. Bihar is one of the states tracked under the central IPM dashboard for this project.
- QWhat is the IPM dashboard and what does it track?
- The Investment Project Monitoring (IPM) dashboard, maintained by DPIIT (Department for Promotion of Industry and Internal Trade), tracks centrally-funded infrastructure projects worth ₹150 Crore and above. Construction of 2-laning with Hard shoulder road of Ukhrul - is one of several Bihar projects tracked under the Roads & Highways sector on the IPM system.