Construction of 2-Lane with paved shoulders of Shillong Western Bypass starting from NH-06 near Ladumsaw existing Km 60.900 of old NH40 to NH106 old NH 44E Package-III, from km 24700 to km 38256 under SARDP-NE PHASE A in the state of Meghalaya on EPC Mode Greenfield alignment
Original Cost
₹562 Cr
Baseline estimate
Revised Cost
₹562 Cr
Latest approved cost
Expenditure
₹340 Cr
Spent to date
Utilization
60.5%
Of revised budget
Cost Status
On Budget
No escalation
Remaining
₹222 Cr
Budget left
Budget Utilization
60.5%Spent
₹340 Cr
Remaining
₹222 Cr
Total
₹562 Cr
Budget Split
Project Timeline
Project Approved
Construction / Implementation
Original End Date
01/09/2026
Revised Completion
30/06/2027
Completed
Project Details
Financial Summary
Project Intelligence
Project is within original budget of ₹562 Cr — no cost escalation recorded.
Expenditure stands at ₹340 Cr, which is 60.5% of the revised project cost.
Remaining budget: ₹222 Cr. Tracked under the DPIIT Investment Project Monitoring system.
Sector: Roads & Highways. Ministry: Ministry of Road Transport & Highways.
Construction of 2-Lane with paved shoulders of Shillong Western Bypass starting from NH-06 near Ladumsaw existing Km 60.900 of old NH40 to NH106 old NH 44E Package-III, from km 24700 to km 38256 under SARDP-NE PHASE A in the state of Meghalaya on EPC Mode Greenfield alignment is a centrally-funded infrastructure project under Ministry of Road Transport & Highways, in the Roads & Highways sector. The original approved cost is ₹562.00 Cr.
This project is tracked under the Investment Project Monitoring (IPM) system maintained by DPIIT. Other central projects in the same sector are listed below.
Frequently Asked Questions
- QWhat is IPM project "Construction of 2-Lane with paved shoulders of Shillong Western Bypass starting "?
- Construction of 2-Lane with paved shoulders of Shillong Western Bypass starting from NH-06 near Ladumsaw existing Km 60.900 of old NH40 to NH106 old NH 44E Package-III, from km 24700 to km 38256 under SARDP-NE PHASE A in the state of Meghalaya on EPC Mode Greenfield alignment is a centrally-funded infrastructure project under the Ministry of Road Transport & Highways, tracked through the Investment Project Monitoring (IPM) system. Sector: Roads & Highways. State: Meghalaya. Original cost: ₹562 Cr.
- QWhat is the cost overrun for this Bihar IPM project?
- The original cost of ₹562 Cr has not been significantly revised. Expenditure: ₹340 Cr (60.5% of cost). Data as of 2026-08.
- QWhich ministry is responsible for this project?
- Construction of 2-Lane with paved shoulders of Shillong West is under the Ministry of Road Transport & Highways in the Roads & Highways sector. Project code: 618419. Bihar is one of the states tracked under the central IPM dashboard for this project.
- QWhat is the IPM dashboard and what does it track?
- The Investment Project Monitoring (IPM) dashboard, maintained by DPIIT (Department for Promotion of Industry and Internal Trade), tracks centrally-funded infrastructure projects worth ₹150 Crore and above. Construction of 2-Lane with paved shoulders of Shillong West is one of several Bihar projects tracked under the Roads & Highways sector on the IPM system.