Construction of 2 lane with paved shoulders Baramulla Bypass Greenfield bypass from existing Ch. Km 47020 to Km 56720 and Design Ch. From 48500 to 62600 Total length 14.100 km on road Srinagar Baramulla Uri NH-01 in the UT of Jammu & Kashmir under Project.Package-III
Original Cost
₹992 Cr
Baseline estimate
Revised Cost
₹992 Cr
Latest approved cost
Expenditure
₹503 Cr
Spent to date
Utilization
50.7%
Of revised budget
Cost Status
On Budget
No escalation
Remaining
₹489 Cr
Budget left
Budget Utilization
50.7%Spent
₹503 Cr
Remaining
₹489 Cr
Total
₹992 Cr
Budget Split
Project Timeline
Project Approved
Construction / Implementation
Original End Date
01/09/2026
Revised Completion
31/07/2027
Completed
Project Details
Financial Summary
Project Intelligence
Project is within original budget of ₹992 Cr — no cost escalation recorded.
Expenditure stands at ₹503 Cr, which is 50.7% of the revised project cost.
Remaining budget: ₹489 Cr. Tracked under the DPIIT Investment Project Monitoring system.
Sector: Roads & Highways. Ministry: Ministry of Road Transport & Highways.
Construction of 2 lane with paved shoulders Baramulla Bypass Greenfield bypass from existing Ch. Km 47020 to Km 56720 and Design Ch. From 48500 to 62600 Total length 14.100 km on road Srinagar Baramulla Uri NH-01 in the UT of Jammu & Kashmir under Project.Package-III is a centrally-funded infrastructure project under Ministry of Road Transport & Highways, in the Roads & Highways sector. The original approved cost is ₹992.00 Cr.
This project is tracked under the Investment Project Monitoring (IPM) system maintained by DPIIT. Other central projects in the same sector are listed below.
Frequently Asked Questions
- QWhat is IPM project "Construction of 2 lane with paved shoulders Baramulla Bypass Greenfield bypass f"?
- Construction of 2 lane with paved shoulders Baramulla Bypass Greenfield bypass from existing Ch. Km 47020 to Km 56720 and Design Ch. From 48500 to 62600 Total length 14.100 km on road Srinagar Baramulla Uri NH-01 in the UT of Jammu & Kashmir under Project.Package-III is a centrally-funded infrastructure project under the Ministry of Road Transport & Highways, tracked through the Investment Project Monitoring (IPM) system. Sector: Roads & Highways. State: Jammu & Kashmir. Original cost: ₹992 Cr.
- QWhat is the cost overrun for this Bihar IPM project?
- The original cost of ₹992 Cr has not been significantly revised. Expenditure: ₹503 Cr (50.7% of cost). Data as of 2026-08.
- QWhich ministry is responsible for this project?
- Construction of 2 lane with paved shoulders Baramulla Bypass is under the Ministry of Road Transport & Highways in the Roads & Highways sector. Project code: 618202. Bihar is one of the states tracked under the central IPM dashboard for this project.
- QWhat is the IPM dashboard and what does it track?
- The Investment Project Monitoring (IPM) dashboard, maintained by DPIIT (Department for Promotion of Industry and Internal Trade), tracks centrally-funded infrastructure projects worth ₹150 Crore and above. Construction of 2 lane with paved shoulders Baramulla Bypass is one of several Bihar projects tracked under the Roads & Highways sector on the IPM system.